Name | Type | Posted | Actions |
|---|---|---|---|
Pendleton Q and As.docx | DOCX | Jul 30, 2025 | |
20D0025 12 month Usage Pendleton.xlsx | XLSX | Jul 25, 2025 | |
Attachment 9 CAC Application Process- Pendleton.pdf | Jul 10, 2025 | ||
Attachment 4 - Provisions and Clauses.docx | DOCX | Jul 10, 2025 | |
Attachment 3 -Pickup Locations -Camp Pendleton.xlsx | XLSX | Jul 10, 2025 | |
Attachment 2 - Price Schedule.xlsx | XLSX | Jul 10, 2025 | |
Attachment 7 Provisions Fill-in.docx | DOCX | Jul 10, 2025 | |
Attachment 8 PPI Questionnaire.pdf | Jul 10, 2025 | ||
Attachment 6 Addenda to 52.212‐2 Evaluation Pendleton.docx | DOCX | Jul 10, 2025 | |
Attachment 5 Addenda to 52.212‐1 Instructions Pendleton.docx | DOCX | Jul 10, 2025 | |
Attachment 10 -KTR Work Surveillance Checklist - ICS Work - Pendleton.pdf | Jul 10, 2025 | ||
Attachment 1 - PWS.docx | DOCX | Jul 10, 2025 | |
Attachment 11 -KTR Work Surveillance Checklist - Placement or Removal Empty ROB or Vac Box - Pendleton.pdf | Jul 10, 2025 |
PENDLETON HAZARDOUS WASTE
PENDLETON HAZARDOUS WASTE
Contact and place of performance
James Mayotte
Camp Pendleton, CA
USA
Amendment 3 - Extends the solicitation close date to Monday, August 18, 2025 3:00pm EST. Amendment 2 - Questions & Answers and extends the closing date to Aug 17, 2025 Q: Given the large number of waste generation locations, does the base consolidate waste at a central location prior to removal, or is the contractor required to service multiple generation sites throughout the base? A: There is no cen...
View moreA: Operations typically require a three-person team consisting of one project manager, one technician, and one driver.
Q: What are the distances between pickup locations?
A: Travel times vary significantly based on location: northern area and Area 22 require up to 30 minutes of travel time, while Delmar area and main side locations require 20-25 minutes. These times may vary due to driving conditions, traffic, holiday schedules, and weather.
Q: Do bulk liquid task orders require pickups from multiple locations with similar logistical requirements (stops, manpower, etc.)?
A: Currently, seven locations require bulk pumping services.
Q: What locations on the base are available for waste consolidation?
A: No consolidation locations are currently available.
Q: Can identical waste streams from multiple pickup locations be consolidated to reduce the total volume of containers requiring removal?
A: Consolidation of similar waste streams is not currently available.
Q: How many roll-off bins are typically maintained on-site? (Documentation suggests 30+)
A: Correct, 30+ roll-off bins are maintained on-site.
Q: Under the bin rental CLINs, is the contractor required to provide an empty bin when removing a full bin?
A: Yes, empty bin replacement is required upon full bin removal. See PWS section 3.2 (paragraphs b-l)
Q: Is the contractor compensated per delivery/removal, or are delivery/removal services included in the weekly/monthly rental fee?
A: Continuous accessibility, for purposes of this Section, shall mean that when a loaded ROB is removed for disposal, an empty lined replacement container shall be simultaneously placed at the same proximal location as the initial placement. Removal of waste in the ROB will be ordered using the appropriate disposal CLIN. Such removal and simultaneous replacement with an empty lined ROB do not affect the termination date of the rental period unless and until the final removal has been ordered, at which time the billable rental period is terminated. See PWS section 3.2 (paragraphs b-l)
Q: The contractor is responsible for supplying defoamer for AFFF pumping. Can you estimate the defoamer quantity required per pickup?
A: Approximately 5-15 gallons of defoamer are required per pickup.
Q: Is any of this information available or are there any manifests with the actual facility profile so I can get pricing?
A: This contact will support multiple generators; each generator may turn in a waste stream using any given CLIN on the contact if their waste meets the parameters of the selected CLINs description. Please note, each generator will have a unique profile or SDS, “for pricing purposes” please use the CLIN description as the overall profile. Note: The contract awardee will receive all generator profiles for all waste streams shortly after award to enable the awardee to get the profiles approved with the treatment facilities of choice.
Q: What is the process to register a TSDF facility? As long as facilities have all permits, is it pretty easy to establish them with the base? If so, what is the timeline to register?
A: For guidance regarding our Qualified Facilities and Transporter List – Please see the Performance Work Statement (PWS), Section 5.0 provided in the solicitation. Additional information for registration (QFL and QTL) can be found at: https://www.dla.mil/Disposition-Services/Offers/Hazardous-Waste-Disposal/.
Amendment 1 - 12-Month Usage report added to available attachments.
Combined Synopsis/Solicitation SP450025R1002 has been prepared in accordance with the procedures in FAR 12.603(c)(2)(i‐xvi). Work requires the selected contractor to provide for the removal, transportation, and disposal of Resource Conservation and Recovery Act (RCRA) hazardous wastes, non-RCRA wastes, State-Regulated wastes, Non-State Regulated wastes, Universal Wastes, Compressed Gases, Polychlorinated Biphenyls (PCBs), and Per- and Polyfluoroalkyl Substances (PFAS) located on or around military installations in the Camp Pendleton, CA region or within a 50-mile radius of any pickup location listed on the Pickup Locations Table (Attachment 3) of the contract. The following additional information is provided in accordance with FAR 12.603(c)(2).
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
(ii) Solicitation SP450025R1002 is issued as a Request for Proposal (RFP).
(iii) This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-04, effective June 11, 2025
(iv) This acquisition is being issued as Full and Open under the associated NAICS code 562211; the Small Business size standard is $47M.
(v) See the attached Price Schedule.
(vi) See the solicitation for a description of the requirement.
(vii) The contract is anticipated to have a 30-month base period from October 2025 to March 2028 and a 30-month option period. See the solicitation for a list of pickup locations.
(viii) The provision at FAR 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition. See the solicitation for addenda to the provision.
(ix) The provision at 52.212-2, Evaluation -- Commercial Items, applies to this acquisition. See the solicitation for addenda to the provision.
(x) Offerors are advised to include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services (MAR 2025) (DEVIATION 2025-O0003), Alternate I, with your offer.
(xi) The clause at 52.212-4, Contract Terms and Conditions -- Commercial Products and Commercial Services, applies to this acquisition.
(xii) The clause at 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services (MAR 2025) (DEVIATION 2025-O0003) applies to this acquisition. See the solicitation for 52.212-5 clauses applicable to this acquisition.
(xiii) See the solicitation for additional contract terms and conditions.
(xiv) The Defense Priorities and Allocations System (DPAS) is not applicable.
(xv) Proposals are due by 15:00 EST on August 9, 2025. Proposals shall be emailed to [email protected] and [email protected].
(xvi) Offerors must submit all questions regarding this solicitation in writing via email to James Mayotte at [email protected]. The cut-off date for the receipt of offeror questions is 12:00p.m. Eastern Standard Time, fourteen (14) calendar days after solicitation issuance. Questions received after that time may not receive an answer.
ATTACHMENTS:
Attachment 1 – Performance Work Statement (PWS)
Attachment 2 – Price Schedule
Attachment 3 – Pick-up Locations
Attachment 4 – Provisions and Clauses
Attachment 5 – Addenda to 52.212-1 Instructions Pendleton
Attachment 6 – Addenda to 52.512-2 Evaluation Pendleton
Attachment 7 - Provisions Fill-in
Attachment 8 – PPI Questionnaire
Attachment 9 – CAC Application Process-Pendleton
Attachment 10 – KTR Work Surveillance Checklist – ICS Work Pendleton
Attachment 11 – KTR Work Surveillance Checklist – Placement or Removal Empty ROB or VAC Box - Pendleton
The Defense Logistics Agency, DLA Disposition Service - EBS, has issued a combined synopsis/solicitation under solicitation number SP450025R1002 for the removal, transportation, and disposal of hazardous and non-hazardous waste. The scope of work includes Resource Conservation and Recovery Act (RCRA) hazardous wastes, non-RCRA wastes, State-Regulated and Non-State Regulated wastes, Universal Wastes, Compressed Gases, Polychlorinated Biphenyls (PCBs), and Per- and Polyfluoroalkyl Substances (PFAS). These services support military installations in the Camp Pendleton, California region or locations within a 50-mile radius of the pickup sites identified in the solicitation. Performance is anticipated to begin in October 2025 with a 30-month base period extending to March 2028, followed by one 30-month option period.
The contractor is required to service 64 areas containing multiple individual sites, as no centralized waste consolidation location is currently available. Operations typically necessitate a three-person team consisting of a project manager, technician, and driver to perform container pickups, which generally require six to seven hours per day throughout the work week. Specific requirements include maintaining and replacing over 30 roll-off bins, providing bulk pumping services at seven locations, and supplying defoamer for Aqueous Film Forming Foam (AFFF) pumping. This acquisition is categorized under NAICS code 562211, Hazardous Waste Treatment and Disposal, and PSC S222, Housekeeping- Waste Treatment/Storage. The solicitation is issued as a Request for Proposal (RFP) with no set-aside (NONE/NONE).
Proposals must be submitted via email to the primary point of contact, James Mayotte, by the response deadline of 3:00 p.m. EST on August 18, 2025. The solicitation includes 13 attachments, such as the Performance Work Statement, Price Schedule, Pickup Locations, and a 12-month usage report. For pricing purposes, offerors are directed to use the Contract Line Item Number (CLIN) descriptions as the overall profiles, with unique generator profiles and Safety Data Sheets (SDS) to be provided to the awardee following the contract start.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.