Name | Type | Posted | Actions |
|---|---|---|---|
C.04 - Signed Bid Abstract W912HN26BA003- Construct Working Dog Kennel Hunter AAF , GA..pdf | May 21, 2026 | ||
B.08-Projnet Q&A Report.pdf | May 5, 2026 | ||
B.07- Site Visit Sign-In Sheet - W912HN-26-BA0003.pdf | Apr 13, 2026 | ||
B.07- Site Visit Minutes - W912HN-26-BA0003.pdf | Apr 13, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Mar 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HN26BA003¬iceType=SolicitationNotice | LINK | Mar 30, 2026 |
Military Working Dog Kennel Hunter Army Airfield, Savannah, Georgia
Military Working Dog Kennel Hunter Army Airfield, Savannah, Georgia
Contact and place of performance
Sarai Hayward
31409
21-May-2026 - the signed bid abstract is now uploaded in SAM.gov. Virtual Public Bid Opening for Solicitation No. W912HN-26-B-A003, Project No: 69262, MILITARY WORKING DOG KENNEL AT HUNTER ARMY AIRFIELD, GA. Join-By methods via TEAMS are below for 5-19-2026 at 1pm EDT. Meeting ID: 993 692 898 470 Passcode: Lr3NW9is - OR - https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_c5ec1e8106954...
View more5-May- 2026 - the report as to the questions and answers from Projnet are now uploaded in SAM.gov
Amendment 0004 is being posted on 1 May 2026 to add RFO 52.222-90 clause to this solicitation.
Amendment 0003 is being posted on 30 April 2026 to which the solicitation removes the following clauses and provisions: DFARS 252.204-7008, DFARS 252.204-7012, DFARS 252.204-7019, DFARS 252.204-7020, DFARS 252.204-7021 and DFARS 252.204-7025.
13-April-2026 - The site visit minutes and sign-in sheet are now uploaded in SAM.gov
Amendment 0002 is being posted on 13 April 2026. The following documents are now included in this solicitation. B08. W912HN26BA003 narrative for the new documents for amendment 0002, B08. W912HN26BA003 Asbestos and lead surveys, B08. W912HN26BA003 Furniture, Fixtures, and Equipment (FF and E), B08. W912HN26BA003 Structural Interior Design (SID) and B08. W912HN26BA003 Veterinary Equipment. Please note that there are No revised specs or drawings to amendment 0002 *** SPECIAL NOTE *** Clarification note to amendment 0001 is also being posted on 13 April 2026 - Bidders will need to complete both bid acceptance schedules that have been updated to reflect the unit price column and grand total amount section. This is found in the document titled B_08_Solicitation Amendment 0001_W912HN26BA0030001_Released_4_3_26. Bidders will find this on the latter part of page 4 through page 9. Also, all bidders will need to sign and date the following document titled B.08-Solicitation Amendment 0001- W912HN26BA0030001 - SF 30. This is for the acknowledgment of amendment 0001 of this solicitation. This is part of Volume II that is on the solicitation.
Amendment 0001 is being posted on 3 April 2026 to correct the bid acceptance schedule periods by including the unit price column and grand total amount section.
The US Army Corps of Engineers (USACE), Savannah District, has a new requirement to award a Firm Fixed Price Contract to construct a SOF Military Working Dog (MWD) Kennel (approximately 11,000 SF) at Hunter Army Airfield, GA to include kennel administration offices, veterinary exam and surgical suite, isolation area, operating room, TA-50 locker area, latrines with showers, tack room, food preparation and storage areas, indoor and outdoor kennels, and building utility support areas. Built- in building systems include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, and communications networks. Supporting facilities include site preparation, utilities, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, and other site improvements. Includes demolition of old kennel adjacent to the site.
The Department of the Army, U.S. Army Corps of Engineers (USACE) Savannah District, is seeking to award a firm-fixed-price contract for Project No: 69262 to construct a Special Operations Forces Military Working Dog Kennel at Hunter Army Airfield in Georgia. The project involves the construction of an approximately 11,000-square-foot facility featuring administration offices, a veterinary exam and surgical suite, an isolation area, and an operating room. Additional requirements include a TA-50 locker area, latrines with showers, a tack room, food preparation and storage areas, and both indoor and outdoor kennels. The work also encompasses building utility support, fire alarm and mass notification systems, fire suppression, HVAC, energy management control systems, electrical systems, and communication networks. Supporting facilities involve site preparation, vehicle parking, access drives, sidewalks, storm drainage, and the demolition of an existing adjacent kennel.
This solicitation is identified under number W912HN26BA003 and is designated as an 8A 8A set-aside. The primary North American Industry Classification System code is NAICS 236220: Commercial and Institutional Building Construction, and the Product Service Code is PSC Y1AZ: Construction of Other Administrative Facilities and Service Buildings. The response deadline for bids and required documents was May 19, 2026, at 11:00 AM EDT, followed by a virtual public bid opening via Microsoft Teams at 1:00 PM EDT. Sarai Hayward is the primary point of contact for the W074 ENDIST Savannah office.
Administrative records for this requirement include five attachments: a signed bid abstract, a Projnet Q&A report, site visit minutes, a site visit sign-in sheet, and an original solicitation document. Multiple amendments were issued throughout the solicitation period to revise specifications and drawings, adjust the bid acceptance schedule to include unit price columns, and incorporate asbestos, lead, and veterinary equipment surveys. The project also entails Furniture, Fixtures, and Equipment (FF&E) and Structural Interior Design (SID) requirements as part of the facility completion.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.