Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 3, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 3, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 3, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DR26RA030¬iceType=Presolicitation | LINK | Mar 3, 2026 |
Unaccompanied Enlisted Personnel Housing (UEPH), Joint Base Myers Henderson-Hall (JBMHH), Fort Myer, Virginia
Unaccompanied Enlisted Personnel Housing (UEPH), Joint Base Myers Henderson-Hall (JBMHH), Fort Myer, Virginia
Contact and place of performance
Amber Rose
22211
Pre-Solicitation Notice: The US Army Corps of Engineers, Baltimore District intends to solicit for an award to construct standard design barracks to include living quarter suites to accommodate 200 Soldiers, clothes, steam and barber rooms. Primary facilities include cybersecurity and antiterrorism/force protection (AT/FP) measures, building information systems, fire protection and alarm systems, intrusion detection...
View moreThe US Army Corps of Engineers, Baltimore District, issued this pre-solicitation notice under solicitation number W912DR26RA030 for the construction of Unaccompanied Enlisted Personnel Housing at Joint Base Myer-Henderson Hall in Virginia. Classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Y1FC CONSTRUCTION OF TROOP HOUSING FACILITIES, the project requires the construction of standard design barracks to accommodate 200 Soldiers. The scope includes living quarter suites, clothes, steam, and barber rooms, along with the demolition of 16 existing buildings totaling 30,897 square feet.
Primary facilities include cybersecurity and antiterrorism/force protection measures, building information systems, fire protection and alarm systems, and energy monitoring control systems. The contractor must provide comprehensive building and furnishing related design services, ensuring facilities meet a minimum life of 40 years in accordance with Department of Defense Unified Facilities Criteria. Supporting infrastructure includes site development, storm drainage, paving, parking, and landscaping. Heating and air conditioning will be provided by a self-contained system estimated at 420 tons, and the project will incorporate sustainability and energy enhancement measures.
The solicitation is scheduled for release on or about April 13, 2026, with a response deadline of April 16, 2026. The performance period is 1460 calendar days from the Notice to Proceed. Amber Rose is the designated point of contact for this requirement, which currently includes one PDF attachment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.