Name | Type | Posted | Actions |
|---|---|---|---|
A7 Coconino Lookout Tower Cistern Demo Spec Revised.docx | DOCX | May 7, 2026 | |
A7 General Decision AZ20260056 01022026 Updated.pdf | May 7, 2026 | ||
A7 Site Visit Attendance Sheet.pdf | May 7, 2026 | ||
A7 SOI Coconino Cistern Demo 2025 Revised.xlsx | XLSX | May 7, 2026 | |
A7 RFI QA 127EAX26Q0029.docx | DOCX | May 7, 2026 | |
A7 SF30 127EAX26Q0029-0001.pdf | May 7, 2026 | ||
A6 Attachment 6 RFI Form.docx | DOCX | Apr 14, 2026 | |
A6 Attachment 5 General Decision AZ20260005 01022026.pdf | Apr 14, 2026 | ||
A6 Attachment 3 COF Industrial Fire Plan Guidelines 2025.pdf | Apr 14, 2026 | ||
A6 Attachment 1 Cistern Demolition SOW.docx | DOCX | Apr 14, 2026 | |
A6 SF1442 127EAX26Q0029 RFQ.pdf | Apr 14, 2026 | ||
A6 Attachment 4 Cistern Demolition SOI.xlsx | XLSX | Apr 14, 2026 | |
A6 Attachment 2 Cistern Demolition Specifications.docx | DOCX | Apr 14, 2026 |
Coconino Lookout Tower Cistern Demolition
Contact and place of performance
James Edington
Flagstaff, AZ 86001
USA
On May 07, 2026, amendment 0001 to solicitation 127EAX26Q0029-Coconino Lookout Tower Cistern Demolition has been posted to SAM.gov and accomplished the following: 1. Post responses to the questions received labeled "A7 RFI QA 127EAX26Q0029." 2. Post site visit attendance sheet labeled "A7 Site Visit Attendance Sheet." 3. Post updated wage determination labeled "A7 General Decision AZ2026...
View moreThe Forest Service has issued solicitation 1153685 for the demolition of the Coconino Lookout Tower cistern located in Flagstaff, Arizona. This requirement is classified under NAICS 238910 for Site Preparation Contractors and PSC P500 for Salvage-Demolition of Structures/Facilities (Other than Buildings). This opportunity is designated as an SBA Small Business Administration set-aside. Interested parties must submit their responses by May 21, 2026, to the primary point of contact, James Edington.
The scope of work involves specific demolition services as outlined in the revised project specifications. Recent updates to the solicitation include the publication of amendment 0001, which provided answers to requests for information, a site visit attendance sheet, and an updated wage determination. Contractors are required to submit an acknowledged SF30 and a revised Statement of Items with their quotes. The procurement includes 13 attachments such as revised specifications, general wage decisions, and request for information documentation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.