Name | Type | Posted | Actions |
|---|---|---|---|
https://www.neco.navy.mil | LINK | Jun 4, 2010 |
RECOVERY--R--PROJECT NUMBER RM09-1439, Advance Meter Installations located at Naval Base Ventura County (NBVC) Port Hueneme, CA.
Contact and place of performance
Chris Henschel (805)982-3014Cecilia Marquez (805)982-2172
Not specified
RECOVERY-PROJECT #RM09-1439, Advance Meter Installations located at the Naval Base Ventura County (NBVC), Port Hueneme, CA, per FAR 5.7. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THEREFORE, FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO SQUARE D COMPANY UNDER CONTRACT TASK ORDER N62583-08-D-0137-0002. The Naval Facilities Engineering Command, Specialty Center Acquisitions, NAVFAC (SCA...
View moreThe Department of the Navy, NAVFAC Systems and Expeditionary Warfare Center, awarded a $2,351,924.00 modification to Square D Company for the design, procurement, installation, and testing of an advanced metering infrastructure (AMI) system. Located at Naval Base Ventura County in Port Hueneme, California, the project involves building-level solutions for electricity, natural gas, steam, and water metering to support the Energy Policy Act of 2005. This award, identified by solicitation number N6258308R0051 and modification 04 of task order N62583-08-D-0137-0002, utilizes funding from the American Recovery and Reinvestment Act of 2009. The work falls under NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors and PSC R.
This contract action was executed using other than competitive procedures as a follow-on modification to an initial competitive order. The Navy determined that Square D Company, a large business, was the only source capable of completing the network without substantial duplication of specialized labor and costs. The scope includes establishing a complex communication network that requires specific firmware, software, and information assurance protocols, such as the DIACAP package. Completing the system with the original contractor avoids technical risks associated with integrating different meters and communication components into the unfinished AMI network. Published on June 4, 2010, the project is managed by contracting officer Chris Henschel and point of contact Cecilia Marquez.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.