Name | Type | Posted | Actions |
|---|---|---|---|
workschedule.pdf | Oct 21, 2009 | ||
Amendment 001 (Cont).doc | DOC | Oct 16, 2009 | |
SistersRepair_Final.pdf | Oct 16, 2009 | ||
Amendment 001 (SF-30).pdf | Oct 16, 2009 | ||
SFSR_RD_subgrade_repair_Specs.doc | DOC | Sep 25, 2009 | |
Wage Determination.doc | DOC | Sep 25, 2009 | |
fire precautions.doc | DOC | Sep 25, 2009 | |
FS ARRA SIGN DETAILS 2apr09.pdf | Sep 25, 2009 | ||
Solicitation SF1442.pdf | Sep 25, 2009 | ||
AG-82B1-S-09-0109.doc | DOC | Sep 25, 2009 | |
Main_SFSR_COVER_PAV_PATCH 1_7 (1).pdf | Sep 25, 2009 |
RECOVERY - South Fork Salmon River Road Subgrade Repair
Contact and place of performance
Paul Pierson
CASCADE, ID
USA
No narrative description provided for this notice.
The USDA Forest Service issued solicitation AG-82B1-S-09-0109 for the repair of the South Fork Salmon River Road subgrade. This project is classified under NAICS 237310 Highway, Street, and Bridge Construction and PSC code Z. The procurement is designated as an HZC HUBZone set-aside, with the place of performance located in Cascade, Idaho.
Responses to this solicitation were due by October 27, 2009, following an initial publication on August 28, 2009. Paul Pierson is the designated point of contact for this requirement. The solicitation package includes 11 attachments, which provide the work schedule, technical specifications, a wage determination, and amendments to the original notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.