Name | Type | Posted | Actions |
|---|---|---|---|
workschedule.pdf | Oct 21, 2009 | ||
Amendment 001 (Cont).doc | DOC | Oct 16, 2009 | |
SistersRepair_Final.pdf | Oct 16, 2009 | ||
Amendment 001 (SF-30).pdf | Oct 16, 2009 | ||
SFSR_RD_subgrade_repair_Specs.doc | DOC | Sep 25, 2009 | |
Wage Determination.doc | DOC | Sep 25, 2009 | |
fire precautions.doc | DOC | Sep 25, 2009 | |
FS ARRA SIGN DETAILS 2apr09.pdf | Sep 25, 2009 | ||
Solicitation SF1442.pdf | Sep 25, 2009 | ||
AG-82B1-S-09-0109.doc | DOC | Sep 25, 2009 | |
Main_SFSR_COVER_PAV_PATCH 1_7 (1).pdf | Sep 25, 2009 |
RECOVERY - South Fork Salmon River Road Subgrade Repair
Contact and place of performance
Paul Pierson
CASCADE, ID
USA
No narrative description provided for this notice.
The USDA Forest Service issued solicitation AG-82B1-S-09-0109 for the South Fork Salmon River Road subgrade repair project in Cascade, Idaho. This recovery project is classified under NAICS 237310 for Highway, Street, and Bridge Construction and PSC Z. The procurement is designated as a HZC (HZC) set-aside, managed by the USDA Forest Service-SPOC IM.
Responses for this solicitation were due by October 27, 2009, and Paul Pierson is the designated point of contact. The notice was originally published on August 28, 2009, and received its final update on October 21, 2009. Performance of the required subgrade repair services takes place in Cascade, Idaho.
There are 11 total attachments associated with this notice, providing technical and administrative details. These documents include a work schedule, the SFSR_RD_subgrade_repair_Specs.doc, a wage determination, and SistersRepair_Final.pdf. Additional documentation includes Amendment 001 (SF-30).pdf and Amendment 001 (Cont).doc, which were posted on October 16, 2009.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.