Name | Type | Posted | Actions |
|---|---|---|---|
N4008526R0005 Amendment 0008.pdf | Jun 1, 2026 | ||
00 01 15_RevAmend08.pdf | Jun 1, 2026 | ||
01 11 00.00 22_RevAmend08.pdf | Jun 1, 2026 | ||
GC100A_Milestones and Coordination Requirements_20260528.pdf | Jun 1, 2026 | ||
Attachment H - Price Proposal Form Revision 2.docx | DOCX | Jun 1, 2026 | |
31 00 00.00 22_Attachment A_Salt Water Tunnels and Building 72_Historical Drawings.pdf | Jun 1, 2026 | ||
J and A ML-26-51 P1112 B72 Resiliency Controller Redacted.pdf | May 20, 2026 | ||
A-400 - ENLARGED PLAN -PUMP ROOMS B AND S AND C.pdf | May 20, 2026 | ||
094 S-308 Rev. 1 P-1112.pdf | May 20, 2026 | ||
101 S-505 Rev. 1 P-1112.pdf | May 20, 2026 | ||
098 S-502 Rev. 1 P-1112.pdf | May 20, 2026 | ||
102 S-506 Rev. 1 P-1112.pdf | May 20, 2026 | ||
086 S-124 Rev. 1 P-1112.pdf | May 20, 2026 | ||
072 S-001 Rev. 1 P-1112.pdf | May 20, 2026 | ||
P-1112 Drawing Updates 2026-04-29.pdf | May 20, 2026 | ||
075 S-102 Rev. 1 P-1112.pdf | May 20, 2026 | ||
Lifting_Eye_Comp_Cut_Sheet_LIFTMAX-PEP-00100 (050726).pdf | May 20, 2026 | ||
A-450 - ENLARGED PLAN DETAILS.pdf | May 20, 2026 | ||
N4008526R0005 Amendment 0007.pdf | May 20, 2026 | ||
08 53 00.pdf | May 12, 2026 | ||
41 22 13.14.pdf | May 12, 2026 | ||
N4008526R0005 Amendment 0006.pdf | May 12, 2026 | ||
N4008526R0005 Amendment 0005.pdf | May 5, 2026 | ||
PPI 98 - V-104 Archaeology Area Outlined.pdf | Apr 27, 2026 | ||
N4008526R0005 Amendment 0004.pdf | Apr 27, 2026 | ||
A-500 - WALL SECTIONS.pdf | Apr 27, 2026 | ||
Option 13 - Accessory Structure_REV2.pdf | Apr 27, 2026 | ||
PPI 200 - 32 17 23.pdf | Apr 27, 2026 | ||
PPI 198 - 26 56 00.pdf | Apr 27, 2026 | ||
PPI 166 - Air Valve Detail.pdf | Apr 27, 2026 | ||
PPI 91 - Sheet 7 of 226 - H-101.pdf | Apr 27, 2026 | ||
PPI 137 - 46 30 00 Attachments 1 to 4.pdf | Apr 27, 2026 | ||
PPIs 181.182.183.208 - Schedule of Special Inspections.pdf | Apr 27, 2026 | ||
PPI 203 - COMNAVREGMIDLANTINST_11320_11B.pdf | Apr 27, 2026 | ||
Attachment H - Price Proposal Form Revised.docx | DOCX | Apr 27, 2026 | |
N4008526R0005 Amendment 0003.pdf | Apr 23, 2026 | ||
P-1112 B72 Resiliency Improvement Site Visit Log.pdf | Apr 9, 2026 | ||
N4008526R0005 Amendment 0002.pdf | Apr 9, 2026 | ||
N4008526R0005 Amendment 0001.pdf | Mar 9, 2026 | ||
DBIDS 5512 Form.pdf | Feb 26, 2026 | ||
DBIDS 5500 Form.docx | DOCX | Feb 26, 2026 | |
Memorandum - Bidding Notes P-1112.pdf | Feb 26, 2026 | ||
P-1112 Specifications.pdf | Feb 26, 2026 | ||
P-1112 Drawings.pdf | Feb 26, 2026 | ||
Attachment G - Small Business Subcontracting Plan (SBSP) Template.docx | DOCX | Feb 26, 2026 | |
Attachment F - Small Business Participation Commitment Document (SBPCD).docx | DOCX | Feb 26, 2026 | |
Attachment E - Historical Small Business Utilization.docx | DOCX | Feb 26, 2026 | |
Attachment D - Past Performance Questionnaire.docx | DOCX | Feb 26, 2026 | |
Attachment C - Construction Experience Data Sheet.docx | DOCX | Feb 26, 2026 | |
Attachment B - PIEE Vendor Access Instructions.pdf | Feb 26, 2026 | ||
Attachment A - PPI Log Template.xlsx | XLSX | Feb 26, 2026 | |
Attachment H - Price Proposal Form.docx | DOCX | Feb 26, 2026 | |
N4008526R0005.pdf | Feb 26, 2026 |
P1112 B72 Resiliency Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, Maine
P1112 B72 Resiliency Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, Maine
Contact and place of performance
James Godwin
Kittery, ME
USA
Please see solicitation and all applicable attachments.
The Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic has issued solicitation N4008526R0005 for the P1112 B72 Resiliency Improvements project located at the Portsmouth Naval Shipyard in Kittery, Maine. This industrial construction requirement is classified under NAICS 236210, Industrial Building Construction, and PSC Y1NE, Construction of Water Supply Facilities. The project scope involves various resiliency upgrades and infrastructure improvements as detailed in the primary solicitation and 53 supporting attachments, which include price proposal forms, milestone requirements, historical drawings for salt water tunnels, and technical specifications.
The procurement is being conducted as a full and open solicitation with no specific set-aside designated in the metadata. Proposals are due by June 16, 2026, following several updates including Amendment 0008, which provided revised coordination requirements and historical documentation. James Godwin serves as the primary point of contact for this requirement, which centers on the modernization and protection of facilities at the Kittery performance location.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.