Name | Type | Posted | Actions |
|---|---|---|---|
HDV_QAs_SET_5_-_08_OCT_2019.xlsx | XLSX | Oct 8, 2019 | |
W56HZV19R0079-0003.pdf | Oct 7, 2019 | ||
Copy_of_HDV_QAs_SET_4_-_07_OCT_2019.xlsx | XLSX | Oct 7, 2019 | |
Copy_of_HDV_QAs_SET_3_-_19_SEP_2019.xlsx | XLSX | Sep 19, 2019 | |
W56HZV19R0079-0002.pdf | Sep 16, 2019 | ||
AMEND_Spec_-_Heavy_Duty_Water_and_Fuel_Truck.doc | DOC | Sep 16, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Water_and_Fuel_Truck.docx | DOCX | Sep 16, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.docx | DOCX | Sep 16, 2019 | |
AMEND_Spec_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.doc | DOC | Sep 16, 2019 | |
HDV_QAs_SET_2_-_11_SEP_2019_AZ.xlsx | XLSX | Sep 11, 2019 | |
HDV_Q&As_SET_1_-_26_AUG_2019.xlsx | XLSX | Aug 26, 2019 | |
Attachment_0005_-_Pricing_FINAL.xlsx | XLSX | Aug 26, 2019 | |
AMEND_Spec_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.doc | DOC | Aug 26, 2019 | |
AMEND_Spec_-_Heavy_Duty_Water_and_Fuel_Truck.doc | DOC | Aug 26, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.docx | DOCX | Aug 26, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Water_and_Fuel_Truck.docx | DOCX | Aug 26, 2019 | |
W56HZV19R0079-0001.pdf | Aug 26, 2019 | ||
Attachment_0002_Specification_Flatbed_&_Personel_Carrier_HDV_Variants.pdf | Aug 8, 2019 | ||
CDRL_A005_First_Production_Vehicle_Final_Report.pdf | Aug 8, 2019 | ||
Attachment_0003_TIQ_Water_and_Fuel_HDV_Variants_(07_AUG_2019).docx | DOCX | Aug 8, 2019 | |
Attachment_0001_Specification_Water_&_Fuel_HDV_Variants.pdf | Aug 8, 2019 | ||
Attachment_0005_-_Pricing_&_Spares.xlsx | XLSX | Aug 8, 2019 | |
Attachment_0004_TIQ_Flatbed_&_Personel_Carrier_HDV_Variants_(07_AUG_2019).docx | DOCX | Aug 8, 2019 | |
Attachment_0006_Critical_Components_List_Water_&_Fuel_Variants.xlsx | XLSX | Aug 8, 2019 | |
CDRL_A004_Final_Inspection_Report.pdf | Aug 8, 2019 | ||
W56HZV19R0079.pdf | Aug 8, 2019 | ||
CDRL_A001_Photographs.pdf | Aug 8, 2019 | ||
Attachment_0008_Offeror_Compliance_Checklist.xlsx | XLSX | Aug 8, 2019 | |
CDRL_A002_Start_of_Work_Meeting_.pdf | Aug 8, 2019 | ||
Attachment_0007_Critical_Components_List_Flatbed_&_Personel_Carrier_Truck_Variants.xlsx | XLSX | Aug 8, 2019 | |
CDRL_A003_Start_of_Production.pdf | Aug 8, 2019 |
Heavy Duty Variants (HDV)
Heavy Duty Variants (HDV)
Contact and place of performance
Andrew J. Zielinsky
Not specified
The amendment page will have to be acknowledged and signed and returned via mail per Section L.2.2.3 Proposal Submission Address - Proposals shall be submitted to the address below. All proposals delivered in response to this solicitation, whether hand-carried or submitted via U.S. mail, shall be addressed as follows: US Army Contracting Command Warren Bid Room, Bldg 231, Mail Stop 303 Attn: W56HZV-19-R-0089 Non-standard Heavy Duty Vehicles (Multiple Variants) Proposal 6501 East 11 Mile Road Warren, MI 48397 5000 No exceptions will be considered.
The U.S. Army Corps of Engineers - Civil Program Financing Only issued solicitation W56HZV19R0079 for the procurement of multiple variants of non-standard heavy duty vehicles. This requirement is classified under NAICS 336120 for Heavy Duty Truck Manufacturing and PSC code 23. Responses are due by October 15, 2019, and must include a signed acknowledgment of the amendment page.
The scope of work involves providing various heavy duty vehicle models, including heavy duty water and fuel trucks as detailed in the solicitation specifications. All proposals, whether hand-carried or delivered via U.S. mail, must be submitted to the US Army Contracting Command Warren Bid Room in Warren, Michigan, specifically referencing proposal W56HZV-19-R-0089. No exceptions to these submission instructions will be considered.
The procurement record includes 31 attachments, featuring multiple sets of question-and-answer documents and formal amendments, such as W56HZV19R0079-0003 and specific documentation for heavy duty water and fuel truck specifications. Andrew J. Zielinsky serves as the primary point of contact for this notice, which was originally published on June 4, 2019, and updated most recently on October 9, 2019.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.