Name | Type | Posted | Actions |
|---|---|---|---|
W9123826RA016_Site Visit Info.pdf | Jun 3, 2026 | ||
W9123826RA016_MICROGRID_Solicitation.pdf | Jun 1, 2026 | ||
W9123826RA016_MICROGRID_Solicitation.pdf | May 29, 2026 | ||
W9123826RA016_20251006_Mt View Microgrid_Certified Final_Drawings.pdf | May 29, 2026 | ||
W9123826RA016_MICROGRID_Solicitation.pdf | May 28, 2026 | ||
W9123826RA016_MountainViewMicrogrid-Spec-Certified Final.pdf | May 28, 2026 | ||
W9123826RA016_Mt View Microgrid_Certified Final_Drawings.pdf | May 28, 2026 | ||
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 28, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 28, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9123826RA016¬iceType=SolicitationNotice | LINK | May 28, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | May 28, 2026 |
U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRID
The U.S. Army Corps of Engineers (USACE) San Francisco District is seeking proposals for a Military Construction (MILCON) Energy Resilience Conservation Investment Program (ERCIP) Microgrid at the 63rd Readiness Division in Mountain View, California. This project is a total Small Business Set-Aside with an estimated value between $10,000,000 and $25,000,000. The goal is to ensure 14 days of energy resilience for mission-critical functions using renewable and fossil fuel sources. The scope includes a 750kW photovoltaic solar system, a 750kWh battery energy storage system, and an 800kW diesel backup generator with a 10,000-gallon fuel tank. The system must have full islanding capability. Proposals are due by June 29, 2026, via the Procurement Integrated Enterprise Environment (PIEE). Per FAR 52.232-18, funds are not currently available, and no award will be made until they are secured. The project involves building a microgrid that combines a 750kW solar array, a 750kWh battery system, and an 800kW diesel generator. A master controller will manage these assets to ensure the facility can operate independently for at least 14 days. Because the system uses a closed restricted network, the contractor must meet Department of Defense cybersecurity requirements to obtain an Authority to Operate. Construction and installation of a microgrid system at the Mountain View Reserve Center to provide 14 days of energy resilience.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Nairi Freeman
Not specified
This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, [email protected]. Estimated Cost Range is between $10,000,000 to $25,000,000. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPR...
View moreOFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
An organized site visit will be held on June 12 at 10am. Attendance is not mandatory for proposal purposes. Please see site plan for details of parking.