FAA NDB-VOR Facilities Demolition, Removal and Restoration Eastern Region
Contact and place of performance
Roland Regan
Jackson, TN 38301
USA
Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Non-directional Beacon (NDB) facility and one Very High Frequency Omnidirectional Range (VOR) facility in the F...
View moreThe Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement.
Demolition, Remediation/Removal, and Restoration Work Plan
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below.
This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described in further detail in the solicitation.
The John A. Volpe National Transportation Systems Center, operating under an interagency agreement with the Office of the Secretary, requires site preparation and restoration services for the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. This project involves the demolition and removal of one Non-directional Beacon (NDB) facility located in Jackson, Tennessee, and one Very High Frequency Omnidirectional Range (VOR) facility located in Bowling Green, Kentucky. The FAA no longer utilizes the equipment or buildings at these locations and intends to remove environmental hazards, demolish onsite structures, and restore disturbed areas before either canceling property leases or repurposing government-owned land.
The contractor is responsible for conducting all work in accordance with federal, state, and local requirements, adhering to the most stringent standards in cases of inconsistency. Key deliverables include the submission of a draft and final Demolition, Removal, and Restoration Work Plan within ten business days of a project kickoff meeting. This plan must detail the technical approach and schedule for all demolition, debris removal, disposal, and site restoration activities. The primary place of performance is Jackson, Tennessee, identified by NAICS 238910 for Site Preparation Contractors and PSC F999 for Other Environmental Services.
This procurement is designated as an SBA set-aside under solicitation number 6913G626R200005. Formal responses are due by May 6, 2026, and the point of contact for this requirement is Roland Regan. Documentation for this solicitation includes a single attachment, RFP 6913G626R2000005.pdf, which was issued on April 10, 2026.