Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 7, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 7, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 7, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3201¬iceType=CombinedSynopsisSolicitation | LINK | May 7, 2026 |
Camp Natural Bridge Griddles
Contact and place of performance
Jason Lewis
10996
Amended to change NAICS. Heavy duty Propane gas griddle, stainless steel front, sides and front top ledge. Fully welded stainless and aluminized steel body frame. 11inch low profile cooking height on 6 inch legs.1 inch thick polished steel griddle plate with 12-gauge, 4inch stainless steel back and tapered side splashes ? Fully welded stainless and aluminized steel chassis frame ? 11 inch low profile cooking height o...
View moreThe Mission Installation Contracting Command at Fort Drum (MICC-FT DRUM) issued this combined synopsis and solicitation under solicitation number W911S226U3201 for the procurement of heavy-duty propane gas griddles. This requirement is a total small business set-aside (SBA) classified under NAICS 333241, Food Product Machinery Manufacturing, and PSC 7310, Food Cooking, Baking, and Serving Equipment. The scope of work includes the delivery of the new units to West Point, New York, the removal of existing griddles from the first floor of the facility, and the installation and startup of the new equipment.
The requested griddles must feature stainless steel construction with a fully welded chassis frame, a one-inch thick polished steel plate, and 27,000 BTU/hr U-shaped aluminized steel burners for every 12 inches of width. Technical specifications require an embedded snap-action thermostat for each burner with a temperature range up to 550 degrees Fahrenheit, a six-quart stainless steel grease drawer, and pilot safety valves that shut off propane gas if the pilot extinguishes. The units must be configured for a 10.0-inch water column propane gas connection and include manual ignition, bottom heat shields, and heavy-duty chromed thermostat knob guards.
Responses to this solicitation are due by May 15, 2026. The procurement process is managed by Jason Lewis, and the official notice, published on May 7, 2026, and updated on May 11, 2026, includes one PDF attachment. All services, including the removal of legacy equipment and the installation of the new griddles, are to be performed at the West Point location.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.