Name | Type | Posted | Actions |
|---|---|---|---|
_max_820-REQ-NBOC2-40-1 Fabrication of MLV_Signed_Redacted.pdf | May 26, 2026 | ||
_min_820-REQ-13 MLV Chassis Req_20260203_printed.pdf | May 26, 2026 | ||
OM-300-200-00-SW_A - Launch Head Assembly_dwg.PDF | May 26, 2026 | ||
08-20021_SPRING LOCKING PIN ASSEMBLY_package.pdf | May 26, 2026 | ||
08-20020_CAT966M BOOM TENSION ROD_package.pdf | May 26, 2026 | ||
08-20019_STAIRCASE CAT966M OVERHEAD WALKWAY package.pdf | May 26, 2026 | ||
08-20018 NBOC-II MLV Electrical Schematic package.pdf | May 26, 2026 | ||
08-20017_CHASSIS JACK ASSEMBLY package.pdf | May 26, 2026 | ||
08-20016_WHEEL CART NBOC MLV.pdf | May 26, 2026 | ||
08-20015 Folding Safety Railing package.pdf | May 26, 2026 | ||
08-20014_BUCKET INTERFACE NBOC MLV.pdf | May 26, 2026 | ||
08-20013_BOOM FAILSAFE package.pdf | May 26, 2026 | ||
08-20012 Service Brake System Package.pdf | May 26, 2026 | ||
08-20011 Model Hydraulic Cylinder package.pdf | May 26, 2026 | ||
08-20010 NBOC MLV Documentation and Reports.pdf | May 26, 2026 | ||
08-20009_SEMI-CHASSIS INTERFACE Package.pdf | May 26, 2026 | ||
08-20008-01_DOCUMENT TREE NBOC MLV.pdf | May 26, 2026 | ||
08-20007-200_CRADLE AXLE CART NBOC MLV.pdf | May 26, 2026 | ||
08-20005 Generator Set Pallet Assembly Package.pdf | May 26, 2026 | ||
08-20004_LAUNCH DECK Assembly Package.pdf | May 26, 2026 | ||
08-20003_FRAME ASSEMBLY_package.pdf | May 26, 2026 | ||
08-20002_BOOM Assembly Package.pdf | May 26, 2026 | ||
08-20001_CHASSIS ASSEMBLY NBOC MLV.pdf | May 26, 2026 | ||
08-20000_MLV ASSEMBLY NBOC MLV.pdf | May 26, 2026 | ||
OM-300-200-00-SW_A - Launch Head Assembly_dwg.PDF | May 18, 2026 | ||
08-20021_SPRING LOCKING PIN ASSEMBLY_package.pdf | May 18, 2026 | ||
08-20020_CAT966M BOOM TENSION ROD_package.pdf | May 18, 2026 | ||
08-20019_STAIRCASE CAT966M OVERHEAD WALKWAY package.pdf | May 18, 2026 | ||
08-20018 NBOC-II MLV Electrical Schematic package.pdf | May 18, 2026 | ||
08-20017_CHASSIS JACK ASSEMBLY package.pdf | May 18, 2026 | ||
08-20016_WHEEL CART NBOC MLV.pdf | May 18, 2026 | ||
08-20015 Folding Safety Railing package.pdf | May 18, 2026 | ||
08-20014_BUCKET INTERFACE NBOC MLV.pdf | May 18, 2026 | ||
08-20013_BOOM FAILSAFE package.pdf | May 18, 2026 | ||
08-20012 Service Brake System Package.pdf | May 18, 2026 | ||
08-20011 Model Hydraulic Cylinder package.pdf | May 18, 2026 | ||
08-20010 NBOC MLV Documentation and Reports.pdf | May 18, 2026 | ||
08-20009_SEMI-CHASSIS INTERFACE Package.pdf | May 18, 2026 | ||
08-20008-01_DOCUMENT TREE NBOC MLV.pdf | May 18, 2026 | ||
08-20007-200_CRADLE AXLE CART NBOC MLV.pdf | May 18, 2026 | ||
08-20005 Generator Set Pallet Assembly Package.pdf | May 18, 2026 | ||
08-20004_LAUNCH DECK Assembly Package.pdf | May 18, 2026 | ||
08-20003_FRAME ASSEMBLY_package.pdf | May 18, 2026 | ||
08-20002_BOOM Assembly Package.pdf | May 18, 2026 | ||
08-20001_CHASSIS ASSEMBLY NBOC MLV.pdf | May 18, 2026 | ||
08-20000_MLV ASSEMBLY NBOC MLV.pdf | May 18, 2026 | ||
_min_820-REQ-13 MLV Chassis Req_20260203_printed.pdf | Mar 17, 2026 | ||
_max_820-REQ-NBOC2-40-1 Fabrication of MLV_Signed_Redacted.pdf | Mar 17, 2026 |
Mobile Launch Vehicle (MLV) Fabrication
The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is issuing this special notice to solicit information for the fabrication of a specialized Mobile Launch Vehicle (MLV) designed for launching scientific balloon payloads. The scope of work includes the delivery of at least one MLV within 18 months of award, with a potential option for a second vehicle. Technical requirements range from a minimum specification defined by the MLV Chassis to a maximum specification for full fabrication, involving components such as launch head assemblies, spring locking pins, and boom tension rods.
Identified by solicitation number GSFC_NBOCII_MLV, this requirement is classified under NAICS 333120, Construction Machinery Manufacturing. Performance will take place at Wallops Island, Virginia. The government is utilizing this notice for planning purposes to determine industry capabilities and to evaluate whether the requirement is a commercial or non-commercial product as defined in FAR 2.101. The administrative record for this notice includes 48 attachments containing redacted drawings and requirement specifications.
Interested parties must submit a response of no more than five pages to Bianca Peters and Amy C. Canfield by 5:00 pm Eastern Time on April 17, 2026. Submissions must include the contractor's name, CAGE code, and a narrative stating the firm’s ability to meet the minimum, maximum, or a mixture of the defined scope. Respondents are also requested to provide an assessment of the product type and may be contacted for additional rough order of magnitude pricing information.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Bianca Peters
Wallops Island, VA 23337
USA
The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is hereby soliciting information from the overall industry for the fabrication of a Mobile Launch Vehicle (MLV). This fabrication will be specialized for the launch of scientific balloon payloads. No solicitation exists; therefore, do not request a copy of the solicitation. If a solicitation is released, it will be synopsized...
View morePlease advise whether the requirement is considered a commercial or non-commercial-type product. A commercial product and commercial service is defined in FAR 2.101, Definitions. Respondents may be contacted for additional ROM/pricing information.
All responses and questions shall be submitted electronically via email to Bianca Peters ([email protected]) and Amy C. Canfield ([email protected]) no later than 5:00 pm Eastern Time on April 17, 2026. Please reference the SAM.gov Notice ID in any response.
This special notice is for information and planning purposes only and is not to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation.
**Updated May 18, 2026: Attached twenty-two redacted drawings.
**Updated May 26, 2026: Removed the "request access" link due to system limitations.