Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 19, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 19, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 19, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S9526BA002¬iceType=SolicitationNotice | LINK | May 19, 2026 |
Repair and Widen Taxiways Phase III, PSTE 162013
Contact and place of performance
Jonathan Bailey
29044
The USPFO for South Carolina intends to issue an Invitation for Bid to award a single firm fixed- price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to repair and expand airfield pavements to meet standard by utilizing conventional design and construction methods at McEntire JNGB. The scope of this project will con...
View moreThe United States Property and Fiscal Office for South Carolina has issued solicitation W50S9526BA002 for the repair and widening of taxiways at McEntire Joint National Guard Base in Richland County, South Carolina. This requirement involves providing all plant, labor, materials, and equipment necessary to remove existing substandard pavement and install new concrete pavement, base course, and storm water drainage improvements. The project also includes relocating taxiway edge lights, signage, and painting taxi lines to support base-assigned and transient aircraft. Work is divided into a base bid for pavement construction and two optional line items for replacing all signs and lights and resealing the ready alert apron.
This procurement is set aside 100% for Small Business (SBA) under NAICS code 237310, Highway, Street, and Bridge Construction, and PSC Z1BD, Maintenance of Airport Runways and Taxiways. The project magnitude is estimated between $10,000,000.00 and $25,000,000.00. The performance period is 365 days after the notice to proceed, structured in two stages: a 180-day pre-construction phase for submittals and permitting, followed by a 180-day construction phase. Jonathan Bailey is the designated point of contact for this Invitation for Bid, and responses are due by June 23, 2026.
Construction must adhere to Department of Defense and Air Force design standards while utilizing local materials and techniques where cost-effective. Contractors are subject to specific subcontracting limitations, requiring that no more than 85 percent of the amount paid by the government, excluding materials, be paid to subcontractors that are not similarly situated entities. One PDF attachment was provided at the time of publication. All new pavements and improvements must be compatible with installation design criteria at the Eastover performance location.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.