Name | Type | Posted | Actions |
|---|---|---|---|
Attachment W - Pier 1 - Amendment 005 Drawings.pdf | Jun 4, 2026 | ||
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf | Jun 4, 2026 | ||
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf | Jun 4, 2026 | ||
Amendment 0005 USCG OPC.pdf | Jun 4, 2026 | ||
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx | DOCX | Jun 4, 2026 | |
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf | Jun 4, 2026 | ||
Bulkhead Pile Plan.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf | Jun 4, 2026 | ||
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf | Jun 4, 2026 | ||
SUB-0284 PDA49B_A.pdf | Jun 4, 2026 | ||
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf | Jun 4, 2026 | ||
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf | Jun 4, 2026 | ||
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf | Jun 4, 2026 | ||
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf | Jun 4, 2026 | ||
Pier Pile Plan.pdf | Jun 4, 2026 | ||
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf | Jun 4, 2026 | ||
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf | Jun 4, 2026 | ||
Trestle Summary.pdf | Jun 4, 2026 | ||
Amendment 0004 USCG OPC.pdf | May 29, 2026 | ||
Attachment V - Pier 1 - Amendment 004 Drawings.pdf | May 29, 2026 | ||
Attachment U - Appendix A - Pier 1 Extension 1968.pdf | May 29, 2026 | ||
Updated Attachment K - WD RI20260001 05-18-2026.pdf | May 29, 2026 | ||
Attachment P - Spc 100 Final Specs Appendix F - Soil GW Sed Sampling Reports.pdf | May 13, 2026 | ||
JA ML-26-43 USCG Sanitary Pumps - Redacted.pdf | May 13, 2026 | ||
JA ML-26-42 USCG Line Insulation Monitor - Redacted.pdf | May 13, 2026 | ||
JA ML-26-41 USCG Comm Shore Tie Receptacle - Redacted.pdf | May 13, 2026 | ||
JA ML-26-40 USCG Kaeser Compressed Air System - Redacted.pdf | May 13, 2026 | ||
CJA ML-23-80 - Redacted.pdf | May 13, 2026 | ||
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf | May 13, 2026 | ||
Attachment S - Pier 1 - Amendment 003 Drawings.pdf | May 13, 2026 | ||
Attachment R - 26 08 00 - Electrical Shore Ties CSTO (Rev B) - Section 2.4.6 Testing.pdf | May 13, 2026 | ||
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf | May 13, 2026 | ||
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx | DOCX | May 13, 2026 | |
Updated Attachment F - SB Participation Commitment Document.docx | DOCX | May 13, 2026 | |
Attachment E - Historical Small Business Utilization.docx | DOCX | May 13, 2026 | |
Attachment D - Past Performance Questionnaire.docx | DOCX | May 13, 2026 | |
Attachment C - Construction Experience Project Data Sheet.docx | DOCX | May 13, 2026 | |
Amendment 0003 USCG OPC.pdf | May 13, 2026 | ||
Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf | Apr 28, 2026 | ||
Amendment 0002 USCG OPC.pdf | Apr 28, 2026 | ||
Updated Attachment G - Individual SB Subcontracting Plan.docx | DOCX | Apr 28, 2026 | |
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf | Apr 28, 2026 | ||
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf | Apr 28, 2026 | ||
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx | XLSX | Apr 28, 2026 | |
Updated Attachment F - SB Participation Commitment Document.pdf | Apr 9, 2026 | ||
Amendment 0001 USCG OPC.pdf | Apr 9, 2026 | ||
Attachment L - Site Visit Log.pdf | Apr 9, 2026 | ||
Attachment H - UCCG OPC Pier Price Proposal Form.pdf | Mar 19, 2026 | ||
Attachment I - SECNAV FORM 5512.pdf | Mar 19, 2026 | ||
Attachment J Site Visit Meeting Location.pdf | Mar 19, 2026 | ||
Attachment K - WD RI20260001 01-30-2026.pdf | Mar 19, 2026 | ||
Specifications USCG OPC Newport.pdf | Mar 19, 2026 | ||
1826479dwg01of05_GEN-CIV.pdf | Mar 19, 2026 | ||
1826479dwg02of05_STRUC1.pdf | Mar 19, 2026 | ||
1826479dwg03of05_STRUC2.pdf | Mar 19, 2026 | ||
1826479dwg05of05_ELEC.pdf | Mar 19, 2026 | ||
1826479dwg04of05_MECH.pdf | Mar 19, 2026 | ||
Solicitation - N4008526R0001.pdf | Mar 19, 2026 | ||
Attachment A - Pre Proposal Inquiry Log.xlsx | XLSX | Mar 19, 2026 | |
Attachment B - PIEE Vendor Access Instructions.pdf | Mar 19, 2026 | ||
Attachment C - Construction Experience Project Data Sheet.pdf | Mar 19, 2026 | ||
Attachment D - Past Performance Questionnaire.pdf | Mar 19, 2026 | ||
Attachment E - Historical Small Business Utilization.pdf | Mar 19, 2026 | ||
Attachment F - SB Participation Commitment Document.pdf | Mar 19, 2026 | ||
Attachment G - Individual SB Subcontrating Plan.pdf | Mar 19, 2026 | ||
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 19, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=N4008526R0001¬iceType=SolicitationNotice | LINK | Mar 19, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 19, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 19, 2026 |
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Contact and place of performance
Kristy GERREK
Newport, RI
USA
Please see solicitation, amendments, and applicable attachments.
The Naval Facilities Engineering Systems Command (NAVFACSYSCOM) Mid-Atlantic has issued solicitation N4008526R0001 for a design-bid-build project to construct the U.S. Coast Guard Offshore Patrol Cutters (OPC) Homeport Pier. Located at Naval Station Newport in Newport, Rhode Island, this heavy and civil engineering construction effort is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1LB, Construction of Highways, Roads, Streets, Bridges, and Railways.
The project scope and technical requirements are detailed across 78 attachments, which include amendment drawings for Pier 1, submarine cable record drawings, and multiple pile driving summary tables from July and August 2024. Proposals for this requirement must be submitted to the Department of the Navy by the response deadline of June 22, 2026. Kristy Gerrek serves as the primary point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.