Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment FA480326Q00250004 SF 30.pdf | May 18, 2026 | ||
Contractor Questions and Answers - LRS Shelves.pdf | May 18, 2026 | ||
Attachement 2 - 20 LRS Shelving Plan (12 May 26).pdf | May 14, 2026 | ||
Attachment 1 - Revised SOW for Shelving_20 LRS_12 May 2026.pdf | May 14, 2026 | ||
Attachment 3- 2015-4439 Rev 13-21 Jul 21-Sumter.pdf | May 14, 2026 | ||
Solicitation Amendment FA480326Q00250003 SF 30.pdf | May 14, 2026 | ||
Solicitation Amendment - FA480326Q00250003.pdf | May 14, 2026 | ||
Attachment 2 - B216 LRS Shelf Drawings.pdf | Apr 23, 2026 | ||
Solicitation - FA480326Q0025.pdf | Apr 23, 2026 | ||
Attachment 1 - Statement of Work - LRS Shelving Units_Revise 2.0.pdf | Apr 23, 2026 | ||
Attachment 3-WD 2015-4439-Rev28-03Dec2025-Sumter.pdf | Apr 23, 2026 | ||
Base Access-Template.pdf | Apr 23, 2026 |
FA480326Q0025 - LRS Shelving Units
Contact and place of performance
Tessa Steward
Charleston AFB, SC 29152
USA
The contractor is responsible for the installation of a pallet rack shelving system in the existing warehouse located in building 216 and in building 1518. The contractor will adhere to safety regulations and manufacturer specifications during the installation process, which includes securely anchoring the shelving to the floor to enhance safety and accessibility, as well as the removal and disposal of any outdated shelving.
The Department of the Air Force, FA4803 20 CONS LGCA, has issued solicitation FA480326Q0025 for the installation of shelving units at Charleston AFB, South Carolina. This requirement is designated as an SBA Small Business Administration set-aside and is classified under NAICS 493110 General Warehousing and Storage and PSC 7125 CABINETS, LOCKERS, BINS, AND SHELVING.
The scope of work requires the contractor to install a pallet rack shelving system in the existing warehouses located in building 216 and building 1518. The contractor must adhere to safety regulations and manufacturer specifications during the installation, which includes securely anchoring the shelving to the floor to improve safety and accessibility. The project also involves the removal and disposal of all outdated shelving units replaced by the new system.
Responses to this solicitation are due by May 21, 2026, with Tessa Steward serving as the point of contact. The solicitation package includes 12 attachments, featuring a revised statement of work, a specific shelving plan for the 20 LRS, contractor questions and answers, and various solicitation amendments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.