No attachments available.
HARNESS ASSEMBLY, PERSONNEL PARACHUTE
Contact and place of performance
Trang Pham
Not specified
SC#: 1000077949 NSN: 1670-00-454-0926 Harness Assembly, Personnel Parachute manufacture IAW QPL-6645 Approved sources: FXC Corporation CAGE 52497 FXC Corporation Guardian Parachute Division CAGE 56600 Pioneer Aerospace Corporation CAGE 77745 Airborne Systems North America of CA Inc CAGE 05QR4 Mills Manufacturing Corporation CAGE 02693 Specifications, plans, or drawings relating to this procurement described are not a...
View moreThe Defense Logistics Agency is seeking a manufacturer for a personnel parachute harness assembly, identified by NSN 1670-00-454-0926. This procurement is classified under NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing and PSC code 16. The requirement is designated as an SBA SBA total small business set-aside. The solicitation, numbered SPE4A719R0898, will result in an indefinite quantity contract featuring a one-year base period and four one-year option periods for a total duration of 60 months. Interested parties must submit responses by May 30, 2019, to point of contact Trang Pham.
The harness assembly is a life support item categorized as both a Critical Safety Item and a Critical Application Item. Manufacturing must comply with QPL-6645 and requires Mylar. Approved sources for this item include FXC Corporation, Pioneer Aerospace Corporation, Airborne Systems North America of CA Inc, and Mills Manufacturing Corporation. Because the government cannot provide specifications or drawings, vendors must demonstrate access to necessary data or traceability to the approved sources. This acquisition requires Higher Level Quality standards, Government First Article Testing, and Government Production Lot Testing. Additionally, the item is under export control, necessitating JCP certification for participating vendors.
The contract includes an estimated annual demand of 427 units, with a guaranteed minimum of 107 units for the base period and a maximum life-of-contract quantity of 3,635 units. The required production lead time is 475 days after receipt of order, with inspection, acceptance, and delivery occurring FOB at Origin. The evaluation for award may consider price, past performance, and other factors, and the government may utilize a reverse auction during the selection process. The solicitation is expected to be issued on or about May 31, 2019, through the DLA Internet Bid Board System.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.