Name | Type | Posted | Actions |
|---|---|---|---|
JA_14R0271_-_FB752.pdf | Apr 27, 2016 |
58--MISCELLANEOUS COMMUNICATION EQUIPMENT
Contact and place of performance
Luis J. Ferrer
REDSTONE ARSENAL, AL 35898
USA
This requirement is for Repair of the subject item for the UH-60 aircraft. No surplus parts shall be used or applied. NOMENCLATURE: Turret, Assembly, Infrared INPUT/OUTPUT NSN: 5855-01-614-8082 INPUT/OUTPUT P/N: 26280-200 ESTIMATED QUANTITY RANGE: Minimum 2 each - Maximum 37 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 6 each) The proposed contractual action will be a five (5) year Firm-Fixed-Pri...
View moreThe Department of the Army, ACC-RSA, has issued a justification for the repair of Infrared Turret Assemblies utilized on UH-60 aircraft. This requirement, identified under solicitation number W58RGZ14R0271, falls under NAICS 334290 Other Communications Equipment Manufacturing and PSC 58. The scope involves maintenance and overhaul services for components with NSN 5855-01-614-8082 and Part Number 26280-200, with a strict requirement that no surplus parts be used in the repair process. Performance is centered at Redstone Arsenal, Alabama.
The proposed contractual action is a five-year, firm-fixed-price Indefinite Delivery, Indefinite Quantity contract. The estimated quantity range for the performance period is a minimum of 2 and a maximum of 37 units, which includes a Foreign Military Sales quantity of six units. As no Depot Maintenance Work Requirement is available for this effort, the contractor is responsible for performing repairs in accordance with contractor specifications and must furnish all necessary labor, facilities, parts, materials, equipment, and tools.
This procurement is conducted as a commercial action under the authority of 10 U.S.C. 2304(c)(1) and FAR 6.302-1, as FLIR Systems Inc. is the only approved source capable of satisfying the agency’s requirements. While FLIR Systems Inc. is the identified source, the agency considers offers from all responsible sources capable of performing the effort. One attachment, a justification and approval document, was published with the notice on April 27, 2016, under the primary point of contact Luis J. Ferrer.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.