Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment W912EF26QA0550001 SF 30.pdf | May 29, 2026 | ||
AM01 Specification revisions.pdf | May 29, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | May 6, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 6, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 6, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EF26QA055¬iceType=CombinedSynopsisSolicitation | LINK | May 6, 2026 |
LGA Visual Monitoring Security Upgrades
Contact and place of performance
Richard Bonnell
99143
THIS PROJECT WILL ADD NEW SECURITY BARRIERS (FENCE, GATE,) FOR ADDITIONAL PERSONNEL SAFETY AND PROJECTSECURITY.THE CONTRACTOR SELECTED TO PERFORM THIS WORK WILL BE REQUIRED TO PERFORM WORK TO INCLUDE:. CONCRETE SAW CUTTING FOR ELECTRICAL UNDERGROUND TRENCH.. SIDEWALK CONCRETE DEMOLITION AND NEW SIDEWALK CONCRETE. MISCELLANEOUS CONCRETE FOOTINGS. INSTALLATION OF MISC BOLLARDS. SELECT FENCE DEMOLITION. ASPHALT REPAIR- REMOVE EXISTING VEHICULAR SWING GATE AND INSTALL MOTOR-OPERATED CANTILEVERED GATE- INSTALL FENCE AND PEDESTRIAN GATE AROUND BASE OF EXISTING EXTERIOR STAIRCASE.- INSTALL, RIGID METALLIC CONDUIT AND UNDERGROUNDSCH40 PVC CONDUIT, AS SHOWN IN THE PLANS
The U.S. Army Corps of Engineers, Walla Walla office, has issued this combined synopsis and solicitation for security upgrades under solicitation number W912EF26QA055. The project involves adding new security barriers, including fencing and gates, to improve personnel safety and overall project security. This requirement is categorized under NAICS 237990 Other Heavy and Civil Engineering Construction and PSC Y1PZ CONSTRUCTION OF OTHER NON-BUILDING FACILITIES. The procurement is designated as an SBA (SBA) set-aside.
The selected contractor will perform concrete saw cutting for electrical underground trenches, sidewalk concrete demolition and replacement, and the installation of miscellaneous concrete footings and bollards. Work also includes fence demolition, asphalt repair, and the removal of an existing vehicular swing gate to be replaced with a motor-operated cantilevered gate. Additionally, the contractor will install a fence and pedestrian gate around the base of an existing exterior staircase along with rigid metallic conduit and underground SCH40 PVC conduit as specified in the project plans.
Responses for this solicitation are due by June 9, 2026. The contract point of contact is Richard Bonnell. The solicitation includes three attachments: a solicitation amendment (SF 30), specification revisions, and one additional document. All work is funded through the civil program financing of the U.S. Army Corps of Engineers.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.