Name | Type | Posted | Actions |
|---|---|---|---|
B.08 Solicitation Amendment - 26QA0300001 - MMD FPF Mini Spider Crane.pdf | Mar 23, 2026 | ||
B.08 Solicitation Amendment - 26QA0300001 - SF 30 - MMD FPF Mini Spider Crane.pdf | Mar 23, 2026 | ||
Solicitation - W912DW26QA030.pdf | Mar 11, 2026 | ||
A.02 MMD FPF Spidercrane Purchase Description.pdf | Mar 11, 2026 |
Mud Mountain Dam Fish Passage Facility Mini Spider Crane
Mud Mountain Dam Fish Passage Facility Mini Spider Crane
Contact and place of performance
Della S. Overton
Enumclaw, WA 98022
USA
SOLICITATION UPDATED TO UPDATE NAICS to 333120 and OFFER DUE DATE UPDATED TO 03 APRIL 2026 NLT 1100 PURCHASE DESCRIPTION Spider Crane for Mud Mountain Dam Fish Passage Facility DESCRIPTION OF PURCHASE: Supply a spider type crane and listed attachment that meet the specifications of this document, all Federal, State and Local regulations and all applicable industry standards. LOCATION: Mud Mountain Dam (MMD...
View moreGENERAL REQUIRMENTS:
1. Items purchased under this contract will be delivered to the location identified in Section 2 of this document. Delivery of equipment must occur during the normal facility operating hours of 7:00 a.m. and 4:00 p.m. Monday through Friday. The staff shall be notified at a minimum 5 business days prior to the delivery occurring. The number for the Dam is 206-764-3514. The POCs for the delivery is Casey Butcher. No delivery shall occur on Federal Holidays.
2. Materials will be inspected at the delivery point prior to acceptance. Contractor shall be responsible for maintaining the product’s condition as specified until the point of acceptance. New equipment only; no remanufactured or “gray market” items.
3. One year warranty must be provided against any product malfunctions and defects in material or workmanship that affects the performance of the product.
4. Manufacturers’ extended warranties to the Government.
5. One day of onsite, 8 hours, hands on training must be provided for the operation of the crane and attachments.
6. Three copies of parts and service manuals for all operating machinery including any accessories/attachments not supplied by crane manufacture.
ITEMS TO SUPPLIED:
1. Base Item 0001 –Provide a self-propelled track mounted mini-crawler crane with “spider” type articulated outrigger legs.
Performance:
Power and control:
Hoisting and safety:
Aerial platform:
POINTS OF CONTACT:
Delivery – Casey Butcher
U.S. Army Corps of Engineers
25305 SE Mud Mountain RD
Enumclaw, WA 98022
Phone: (206) 316-3024, (206) 764-3514
Project Manager – Michael Diddams
U.S. Army Corps of Engineers
30525 SE Mud Mountain Rd
Enumclaw WA 98022-8010
(206) 966-9974
The Department of the Army, specifically the U.S. Army Corps of Engineers Seattle District, has issued solicitation W912DW26QA030 for the procurement of a mini spider crane to be used at the Mud Mountain Dam Fish Passage Facility in Enumclaw, Washington. This requirement is a total small business set-aside under the SBA (SBA) designation, classified under NAICS code 333120 for Construction Machinery Manufacturing and PSC 3810 for Cranes and Crane-Shovels. The purpose of the equipment is to support the inspection, maintenance, and repair of the fish passage facility, including operations on bridge decks and within presort and crowding pools.
The scope of work includes the delivery of a self-propelled, track-mounted mini-crawler crane with spider-type articulated outrigger legs and an aerial platform attachment. Required specifications include a minimum lifting capacity of 6,400 lbs, electric power with AGM batteries, and wireless radio remote control capabilities. The contract also mandates a one-year warranty, three copies of parts and service manuals, and one full day of onsite hands-on training for facility staff. Only new equipment is acceptable; remanufactured or gray market items will not be considered.
The performance period requires delivery of the crane and its attachments within two months of the order receipt. Deliveries must be coordinated at least five business days in advance and must occur during standard facility operating hours at the Southeast King County location. Responses to this solicitation are due by April 3, 2026. The procurement process has included four attachments to date, including two solicitation amendments, the primary solicitation document, and a detailed purchase description.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.