Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U2926¬iceType=CombinedSynopsisSolicitation | LINK | Mar 30, 2026 |
Request for Quote (RFQ) - EDCO 30 in Self-Propelled Gasoline Concrete Saw (ED31400)
Request for Quote (RFQ) - EDCO 30 in Self-Propelled Gasoline Concrete Saw (ED31400)
Contact and place of performance
Daniel Goldberg
21702
The purpose of this amendment is to update the Schedule of Supplies/Services to add a new Contract Line Item Number CLIN 002 for one 1 30 inch concrete saw blade. Clarify the Salient Characteristics for CLIN 001 EDCO SS30 30 Inch Gasoline Self-Propelled Concrete Saw or Equal to explicitly note that the blade is not included with the base unit and must be quoted separately under CLIN 002.Establish the minimum firm requirements and salient characteristics for both CLIN 001 and CLIN 002 to facilitate Brand Name or Equal evaluations. All other terms and conditions of the solicitation remain unchanged.
The Department of the Army, MICC-Fort Drum, issued solicitation W911S226U2926 as a combined synopsis and solicitation for an EDCO 30-inch self-propelled gasoline concrete saw and an associated saw blade. This procurement is a Small Business Administration (SBA) set-aside classified under NAICS code 333991 for Power-Driven Handtool Manufacturing and PSC 3895 for Miscellaneous Construction Equipment. Responses are due by April 20, 2026, and may be directed to Daniel Goldberg.
The requirement involves two primary contract line items to facilitate brand name or equal evaluations. CLIN 001 covers the EDCO SS30 30-inch gasoline self-propelled concrete saw, or an equivalent model, while CLIN 002 is for one 30-inch concrete saw blade. Salient characteristics for these items specify that the saw blade is not included with the base unit and must be quoted separately. A single PDF attachment was posted on March 30, 2026, alongside the initial notice, and subsequent updates established the minimum firm requirements for both line items.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.