Name | Type | Posted | Actions |
|---|---|---|---|
Attach 01 - REVISED Bid Schedule 3 AUG 2020.pdf | Aug 3, 2020 | ||
Solicitation Amendment - FA441720R00090004.pdf | Aug 3, 2020 | ||
Solicitation Amendment FA441720R00090004 SF 30.pdf | Aug 3, 2020 | ||
Questions and Answers FA441720R0009.docx | DOCX | Jul 30, 2020 | |
Attach 22 - Lead Based Paint Survey.pdf | Jul 30, 2020 | ||
Solicitation Amendment - FA441720R00090003.pdf | Jul 30, 2020 | ||
Solicitation Amendment FA441720R00090003 SF 30.pdf | Jul 30, 2020 | ||
Solicitation Amendment FA441720R00090002 SF 30.pdf | Jul 24, 2020 | ||
Solicitation Amendment - FA441720R00090002.pdf | Jul 24, 2020 | ||
Site Visit SIGN-IN ROSTER 9 July 2020.pdf | Jul 9, 2020 | ||
Pre-Proposal Site Visit Water Tower Mx IDIQ.pdf | Jul 9, 2020 | ||
Solicitation Amendment FA441720R00090001 SF 30.pdf | Jul 1, 2020 | ||
Solicitation Amendment - FA441720R00090001.pdf | Jul 1, 2020 | ||
Attach 12 - Tower 808 Inspection Report (90808).pdf | Jun 30, 2020 | ||
Attach 11 - Tower 7 Inspection Report (91134).pdf | Jun 30, 2020 | ||
Attach 10 - Tower 5 Inspection Report (90354).pdf | Jun 30, 2020 | ||
Attach 09 - Tower 2 Inspection Report (90335).pdf | Jun 30, 2020 | ||
Attach 08 - Tower 2 (90335) Graphics.pdf | Jun 30, 2020 | ||
Attach 07 - Specs - Tower 808 (90808).pdf | Jun 30, 2020 | ||
Attach 05 - Specs - Tower 5 (90354).pdf | Jun 30, 2020 | ||
Attach 04 - Specs - Tower 2 (90335).pdf | Jun 30, 2020 | ||
Attach 03 - Master SOW 04 June 20.pdf | Jun 30, 2020 | ||
Attach 02 - Master Specifications 01 June 20.pdf | Jun 30, 2020 | ||
Attach 01 - Bid Schedule.pdf | Jun 30, 2020 | ||
Attach 18 - SEED Project OP1020558 - WTA.pdf | Jun 30, 2020 | ||
Attach 06 - Specs - Tower 7 (91134).pdf | Jun 30, 2020 | ||
Attach 20 - Past Present Performance Questionnaire.pdf | Jun 30, 2020 | ||
Attach 19 - WD FL20190217 - 21 Feb 20.pdf | Jun 30, 2020 | ||
Attach 16 - Tower 808 (90808) Location.pdf | Jun 30, 2020 | ||
Attach 17 - SEED Project OP1020558 - SOW 18 Jun 20.pdf | Jun 30, 2020 | ||
Attach 21 - Financial Reference Sheet.pdf | Jun 30, 2020 | ||
Solicitation - FA441720R0009.pdf | Jun 30, 2020 | ||
Attach 15 - Tower 7 (91134) Location.pdf | Jun 30, 2020 | ||
Attach 14 - Tower 5 (90354) Location.pdf | Jun 30, 2020 | ||
Attach 13 - Tower 2 (90335) Location.pdf | Jun 30, 2020 |
Water Tower Maintenance IDIQ
Water Tower Maintenance IDIQ
Contact and place of performance
Lukas M. Anderson
Hurlburt Field, FL 32544
USA
*Amendment 0004: Issued 3 August 2020 to include the revised bid schedule. Review the SF 30 for amendment 0004 for additional details. *Clarification on provision 52.228-1, Bid Guarantee 31 July 2020: paragraph (c) of the aforementioned provision states "The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less". In this instance, the bid price for indefinite-quantity co...
View moreThe Department of the Air Force, specifically the 1st Special Operations Contracting Squadron (1 SOCONS), is soliciting a firm-fixed-price Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for water tower maintenance at Hurlburt Field, Florida. This acquisition is a Women-Owned Small Business (WOSB) set-aside under NAICS code 237110, Water and Sewer Line and Related Structures Construction, and PSC Z2NE, Repair or Alteration of Water Supply Facilities. The project has an estimated magnitude between $1,000,000 and $5,000,000. Responses are due by August 6, 2020.
The selected contractor will provide all labor, materials, tools, supervision, and equipment required for maintenance construction projects affecting water tower real property in support of the 1st Special Operations Civil Engineer Squadron. Primary service requirements include water tower inspections, washout and disinfection, interior and exterior painting, and general repairs. The contract structure consists of a 12-month base year followed by four option years. A bid guarantee is required, calculated as 20 percent of the specified minimum quantity of $200,000.00 or $3,000,000.00, whichever is less.
Solicitation FA441720R0009 includes 35 attachments, featuring revised bid schedules, solicitation amendments, a lead-based paint survey, and a questions and answers document. Lukas M. Anderson serves as the primary point of contact for this requirement. Following award, the contractor must provide payment and performance bonds within ten days. Award will be made using negotiated procedures in accordance with FAR Part 15.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.