Name | Type | Posted | Actions |
|---|---|---|---|
Base Admin Building_CNC LUC Area Construction Permit_Approved.pdf | Aug 28, 2025 | ||
70Z04725PCNI0007 Amendment 0005.pdf | Aug 28, 2025 | ||
70Z04725PCNI0007 Amendment 0004 PPI 22 Response.pdf | Aug 15, 2025 | ||
70Z04725PCNI0007 Amendment 0004.pdf | Aug 14, 2025 | ||
TruckSearchCanopy.pdf | Aug 14, 2025 | ||
Base Admin Geotechnical Report (2024).pdf | Aug 8, 2025 | ||
Site Visit Attendance Log.pdf | Aug 8, 2025 | ||
LUC Area Construction Permit BLANK 2018-1003.pdf | Aug 8, 2025 | ||
70Z04725PCNI0007 Amendment 0003.pdf | Aug 8, 2025 | ||
70Z04725PCNI0007 Amendment 0002.pdf | Jul 25, 2025 | ||
Attachment A. Site Visit Meeting Location.pdf | Jul 25, 2025 | ||
Attachment B. Base Charleston Topo Utilities.zip | ZIP | Jul 22, 2025 | |
70Z04725PCNI0007 Amendment 0001.pdf | Jul 22, 2025 | ||
Pre-Proposal Inquiry Form.xlsx | XLSX | Jul 11, 2025 | |
General Decision Number SC20250023 01.03.2025.pdf | Jul 11, 2025 | ||
Attachment L - FLETC Final Grading and Drainage Plan.pdf | Jul 11, 2025 | ||
70Z04725PCNI0007 Task Order Announcement (TOA).pdf | Jul 11, 2025 | ||
70Z04725PCNI0007 SF1442.pdf | Jul 11, 2025 | ||
General Decision Number SC20250041 01.03.2025.pdf | Jul 11, 2025 | ||
Attachment K - USCG-FLETC Fence Line MOU.pdf | Jul 11, 2025 | ||
Attachment J - Sanitary Sewer As-Built Drawings.pdf | Jul 11, 2025 | ||
Attachment I - 2004 RDA SS As-Builts.pdf | Jul 11, 2025 | ||
Attachment H - BASE Charleston - Mechanical for UMCS system.pdf | Jul 11, 2025 | ||
Attachment G - SCPA N. Hobson Ave. Reconstruction.pdf | Jul 11, 2025 | ||
Attachment F - Base Charleston Admin Facility Rendering.pdf | Jul 11, 2025 | ||
Attachment E - Referenced Design Standards and CSTOs.zip | ZIP | Jul 11, 2025 | |
Attachment D - Electrical Service Documents.zip | ZIP | Jul 11, 2025 | |
Attachment B - Geotechnical Report.zip | ZIP | Jul 11, 2025 | |
Attachment A - Hydrostatic Flow Test Report.pdf | Jul 11, 2025 | ||
CHARLESTON INFRA SPECS_COMBINED_24JUN25.pdf | Jul 11, 2025 | ||
CHAR INFRA DRAWINGS COMBINED 23JUNE25.pdf | Jul 11, 2025 |
DESIGN BUILD CONSTRUCTION FOR UTILITY INFRASTRUCTURE, ROADS & CLINIC AT USCG BASE CHARLESTON, SOUTH CAROLINA
Contact and place of performance
barbara williamson-garris
Charleston, SC
USA
This project is for new Entry Control Point/Main Gate to include a Guard House and Visitor's Check-In Center. This project will install new site utilities for the new facilities as indicated on the RFP Drawings and Specifications. This project will also include the construction of a Medical/Dental Facility to provide all Medical and Dental clinic functions, as well as offices and counseling areas for the Work Lif...
View moreThe US Coast Guard, FDCC(00047), is soliciting design-build construction services for utility infrastructure and facilities at USCG Base Charleston in South Carolina. The scope of work includes the development of a new Entry Control Point and Main Gate featuring a Guard House and Visitor’s Check-In Center, as well as the installation of supporting site utilities. The project also requires the construction of a Medical/Dental Facility to accommodate clinical functions, offices, and counseling areas for Work Life staff. This facility must feature a primarily open ground floor design to allow for storm surge flow and minimize damage from natural disasters.
This requirement is identified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1DB for Construction of Laboratories and Clinics. The solicitation has no set-aside, designated as set-aside NONE (NONE). The Medical/Dental Facility must be designed with an integrated approach to energy efficiency and environmental performance, adhering to High Performance and Sustainable Building (HPSB) technologies and the 2020 Guiding Principles for Sustainable Federal Buildings. These standards prioritize optimized energy performance, indoor environmental quality, and building resilience.
The contractor is responsible for executing work according to RFP specifications and government-accepted, contractor-originated drawings. Solicitation 70Z04725RPCNI0007 has a response deadline of October 17, 2025. The solicitation includes 31 attachments, such as geotechnical reports, construction permits, and various amendments. Barbara Williamson-Garris is the designated point of contact for this project located in Charleston, South Carolina.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.