Name | Type | Posted | Actions |
|---|---|---|---|
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S6T26BA019¬iceType=SolicitationNotice | LINK | May 8, 2026 |
N041 - HAYW 26-2011 Replace HVAC B122
Contact and place of performance
Justin Scales
Fresno, CA 93727
USA
The full solicitation is posted on the PIEE solicitation module at: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S6T26BA019&noticeType=SolicitationNotice Bids must be submitted through the PIEE solicitation module. Details are located at Section L - Instructions, Conditions, Notices to Offerors or Quoters on the SF 1442. Prospective contractors must gain solicitation submission access...
View moreThe Department of the Army, acting through the W7MX USPFO Activity CAANG 144, has issued a solicitation for the replacement of HVAC systems at Building 122 located at Fresno Air National Guard Base in Fresno, California. This project is designated under NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors and PSC N041 Installation of Equipment- Refrigeration, Air Conditioning, and Air Circulating Equipment. The procurement is reserved for a Small Business Administration (SBA) set-aside. Interested parties must submit bids through the PIEE solicitation module by the response deadline of May 22, 2026.
The 144th Fighter Wing intends to award a single firm-fixed-price contract for non-personal construction services involving the removal of four existing HVAC units, auxiliary air ducting, and electrical and drain lines. The contractor is required to provide all labor, materials, equipment, and supervision to install a new 40-ton HVAC system with corresponding infrastructure. This system must maintain specific environmental constraints for training equipment, including an operating temperature range of 59 to 78 degrees Fahrenheit and operating humidity between 35% and 80%. Work also includes replacing existing dust covers with custom-made roof adapters to transition from the current ductwork.
To comply with Intelligence Community Directive (ICD) Number 705 and maintain building security, the contractor is prohibited from making new building penetrations and must utilize existing openings to the maximum extent practicable. All construction must conform to Unified Facilities Criteria (UFC) 3-410-01. Detailed instructions regarding the required bid guarantee, site visits, and submission requirements are provided in the solicitation documentation, which consists of one attachment posted on May 8, 2026. Justin Scales serves as the point of contact for solicitation W50S6T26BA019.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.