Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 6 - Questions and Answers.pdf | May 19, 2026 | ||
Attachment 5 - WD MT20260075 01022026.pdf | Apr 30, 2026 | ||
Attachment 4 - Kading Campground Well Drawings.pdf | Apr 30, 2026 | ||
Attachment 3 - Experience Questionnaire.doc | DOC | Apr 30, 2026 | |
Attachment 2 - Statement of Work.pdf | Apr 30, 2026 | ||
Attachment 1 - Schedule of Items.pdf | Apr 30, 2026 | ||
1- Combined Synopsis Solicitation Commercial Construction.pdf | Apr 30, 2026 |
Helena-Lewis & Clark NF - Kading Campground Well Drilling
Contact and place of performance
Daniel Franco
Elliston, MT 59728
USA
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0069 is issued as a Request for Quotation (RFQ) for Kading Campground Well Drilling. This project is for the development of well and h...
View moreSCOPE OF CONTRACT
A. Base Items:
a. This project is for the development of well and hand pump to serve the Kading Campground in the Helena Ranger District of the Helena-Lewis and Clark National Forest.
b. Work includes drilling a well and installing a complete hand pump assembly on new well casing, concrete pad, drain, and all pump components necessary for a typical campground water supply.
c. Contractor is responsible for all labor, materials, tools, etc. necessary to complete the work. All waste and excess materials generated from construction shall be disposed of off Forest Service lands and in compliance with governing federal, state, and local laws.
PERIOD OF PERFORMANCE:
A. June 22, 2026 - September 30, 2026.
B. All work shall be completed by September 30, 2026.
SITE VISIT:
A. No official Site Visit shall be performed. Per FAR Part 52.236-3 “Site Investigation and Conditions Affecting the Work”, contractor is encouraged and expected to visit the site. Ensure you are familiar with inclement weather as this may hinder access to certain roads.
PRICE RANGE:
A. Between $25,000 and $100,000.
Performance & Payment Bonds (FAR 52.228-15):
Both required at 100% of original contract
price if value in excess of $150,000, due 10 days after award. Only payment protections are required
for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment
bond allowed per FAR 52.228-13, due within 10 days of contract award.
DOCUMENTS TO RETURN:
The following documents shall be submitted by the quoter for evaluation to be considered responsive:
• Attachment 1 - Schedule of Items
• Attachment 2 - Statement of Work
• Attachment 3 - Experience Questionnaire
• Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable.
Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9
Attn: Daniel Franco
E-mail: [email protected]
For solicitation questions call email [email protected]. Questions are due no later than 15
May, 2026 by 12:00 P.M. (Mountain Time). This will ensure enough time to respond before the
solicitation period ends. Please include the solicitation name and number (Kading Campground Well
Drilling, 1240LU26Q0069) as the subject line of the email.
The USDA Forest Service, Intermountain Zone CSA #9, has issued solicitation 1240LU26Q0069 as a request for quotation for the Kading Campground Well Drilling project. This requirement involves the development of a well and hand pump to serve the Kading Campground within the Helena Ranger District of the Helena-Lewis and Clark National Forest in Elliston, Montana. The scope of work includes drilling a well and installing a complete hand pump assembly on new well casing, along with a concrete pad, drain, and all pump components necessary for a typical campground water supply. The contractor is responsible for all labor, materials, and tools, as well as the off-site disposal of all waste and excess materials generated during construction.
The performance period for this project is scheduled from June 22, 2026, through September 30, 2026. This acquisition is a total small business set-aside (SBA) with an estimated price range between $25,000 and $100,000. It is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE Construction of Water Supply Facilities. Although no official site visit will be conducted, contractors are encouraged to investigate the site and account for potential inclement weather conditions that may affect road access.
Quotations must be submitted by the response deadline of May 22, 2026, to Daniel Franco. Submission requirements include a schedule of items, a statement of work, and an experience questionnaire. Seven total attachments are associated with this notice, providing the statement of work, drawings, an experience questionnaire, a wage determination, and a questions and answers document. Questions regarding this solicitation are due by May 15, 2026. Payment protections are required for contracts exceeding $35,000, while performance and payment bonds are required for contracts exceeding $150,000.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.