No attachments available.
Okamoto ACC-32140CHiQ CNC surface grinder
Contact and place of performance
Nicolasa Cicero
Bremerton, WA
USA
The DLA-Aviation is issuing this source sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support this requirement for a Okamoto ACC-32140CHiQ CNC surface grinder. THIS SOURCES SOUGHT IS FOR INFORMATION PURPOSES ONLY. THIS IS NOT A REQUEST FOR QUOTE/PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GO...
View moreInterested parties that can provide the required Okamoto ACC-32140CHiQ CNC surface grinder with turnkey services including: tooling, training, technical data( manuals, drawings), IUID tag, installation, and foundation may identify their interest and capability to respond to this requirement no later than the stated closing date/time.
FOB will be at Destination with preliminary inspection at Origin, final inspection and acceptance at Destination.
location of work Bangor, Wa
DLA Aviation has issued a Sources Sought notice, solicitation number 26-26-1003, to conduct market research for an Okamoto ACC-32140CHiQ CNC surface grinder. This requirement is categorized under NAICS 333517 Machine Tool Manufacturing and PSC 3415 GRINDING MACHINES. The agency seeks parties capable of providing the machine along with turnkey services including tooling, training, technical data such as manuals and drawings, IUID tags, installation, and foundation work. This notice includes an 8AN 8AN set-aside.
The primary place of performance is Bremerton, Washington, with shipping terms designated as FOB Destination. Preliminary inspection will occur at Origin, while final inspection and acceptance will be conducted at the destination. The procurement includes the delivery and setup of the equipment, as well as the provision of necessary technical documentation and operator training. There are currently no attachments associated with this notice.
Interested parties must submit capability responses by April 4, 2026, via email to [email protected]. Submissions are limited to ten one-sided pages and must include the company’s business size, manufacturer status, and any planned subcontractor partnerships. Responses must also provide a basis of estimate covering total procurement requirements, including machine costs, training, technical data, installation, foundation work, and shipping.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.