Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 8, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 8, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 8, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9126G26RA019¬iceType=SolicitationNotice | LINK | May 8, 2026 |
Climate Controlled Storage Facility
Climate Controlled Storage Facility
Contact and place of performance
Kristi MORRIS
Not specified
Update 0002 is to issue Amendment 0001 // Update 0001 is to include the Site Visit Sign-In sheet and photos. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Climate Controlled Storage Facility, Red River Army Depot, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module.
The Department of the Army, specifically the U.S. Army Corps of Engineers Fort Worth District (W076 ENDIST FT WORTH), has issued solicitation W9126G26RA019 for the construction of a climate-controlled storage facility at the Red River Army Depot in Texas. This requirement is a 100% Small Business Set-Aside (SBA) designated for a design-bid-build construction project. The work is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1GZ for Construction of Other Warehouse Buildings.
Recent administrative updates to the notice include the issuance of Amendment 0001 as well as the addition of site visit sign-in sheets and photographs. Full details for this project are provided through the PIEE Solicitation Module. One PDF attachment was posted on May 8, 2026, and the response deadline for this procurement is June 22, 2026. Kristi Morris is the primary point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.