Name | Type | Posted | Actions |
|---|---|---|---|
SF 1409.pdf | May 17, 2022 | ||
Attachment_0001 - Amend 2_PNW Competitive Effort Performance Work Statement_10MAY22.doc | DOC | May 12, 2022 | |
Attachment_0009_QandA_v2.xlsx | XLSX | May 12, 2022 | |
N6134022B0001_AMD02.pdf | May 12, 2022 | ||
N6134022B0001_AMD02_CONFORM.pdf | May 12, 2022 | ||
N6134022B0001_AMD01.pdf | May 5, 2022 | ||
Attachment_0001 - Amend 1_PNW Competitive Effort Performance Work Statement_05MAY22.doc | DOC | May 5, 2022 | |
Attachment_0007_GFP_List_5.02.22.xlsx | XLSX | May 5, 2022 | |
Attachment_0009_Question_and_Answer.xlsx | XLSX | May 5, 2022 | |
Attachment_0011_SOP_GFP_Sanitation_Cabinet.docx | DOCX | May 5, 2022 | |
Attachment_0010-GFP Fire Sanitation Cabinet Owners Manual.pdf | May 5, 2022 | ||
N6134022B0001_CONFORM_AMD01.pdf | May 5, 2022 | ||
Attachment_L1_PACNORWEST_Bid_Price.xlsx | XLSX | Apr 15, 2022 | |
Attachment 8_Standard_Operating_Procedures.docx | DOCX | Apr 15, 2022 | |
Attachment 6 NETCINST 1500.13C (NETC High and Moderate Risk Training Safety Program).pdf | Apr 15, 2022 | ||
Attachment 5 (TCCD) A-495-0018A Shipboard Firefighting Integrated Team Trainer.pdf | Apr 15, 2022 | ||
Attachment 5 (TCCD) A-495-0021 Shipboard Firefighting Damage Control Emergency Team Trainer.pdf | Apr 15, 2022 | ||
Attachment 5 (TCCD) K-495-0045B General Shipboard Damage Control Training.pdf | Apr 15, 2022 | ||
Attachment 5 (TCCD) A-495-0416B General Shipboard Firefighting-(SCBA).pdf | Apr 15, 2022 | ||
Attachment 4 Wage Adjustment Baseline Form.xlsx | XLSX | Apr 15, 2022 | |
Attachment 3 DOL Wage Determination 15-5536 Rev 12 061020.pdf | Apr 15, 2022 | ||
Attachment 2 Data Item Transmittal (DIT) Form 4330.pdf | Apr 15, 2022 | ||
Attachment 7 GFP 071420 Final.xlsx | XLSX | Apr 15, 2022 | |
Attachment 5 (TCCD) J-495-0419B Advanced Shipboard Firefighting.pdf | Apr 15, 2022 | ||
Attachment 1 - PNW Competitive Effort Performance Work Statement - signed.pdf | Apr 15, 2022 | ||
CDRL A007- Mishap Investigation and Reporting_PACNORWEST.docx | DOCX | Apr 15, 2022 | |
CDRL A006- Technical Report_PACNORWEST.docx | DOCX | Apr 15, 2022 | |
CDRL A005 - Structural Integrity Survey_PACNORWEST.doc | DOC | Apr 15, 2022 | |
CDRL A008- QSP_PACNORWEST.docx | DOCX | Apr 15, 2022 | |
CDRL A004 - Facility Modifications_PACNORWEST.doc | DOC | Apr 15, 2022 | |
PWS Attachment 1 HRTSE Checklist and Firefighting Checklist.pdf | Apr 15, 2022 | ||
N6134022B0001.pdf | Apr 15, 2022 | ||
CDRL A003 - Conference Minutes_PACNORWEST.doc | DOC | Apr 15, 2022 | |
CDRL A002 - Contractor Operation and Mainentance of TSG_GFE Management report_PACNORWEST.doc | DOC | Apr 15, 2022 | |
CDRL A001 - Monthly Reports_PACNORWEST.doc | DOC | Apr 15, 2022 |
PACNORWEST Turn Key live-fire Fire Fighting and Damage Control Training
Contact and place of performance
Lisa Mardin
Not specified
17 May 2022: Bid Abstract has been added to Attachments Amendment 0002: The purpose of Amendment 0002 is to:1) update Attachment 0009 Question and Answers under Section J; and 2) update Attachment 0001 Performance Work Statement under Section J. The date/time for bid submissions remains unchanged. Amendment 0001: The purpose of Amendment 0001 is to: 1) incorporate Question and Answers as Attachment 0009 under Section...
View moreThe Naval Air Warfare Center Training Systems Division (NAWCTSD), representing the Department of the Navy, issued solicitation N6134022B0001 for the PACNORWEST competitive effort. This procurement involves education and training services classified under NAICS 611519, Other Technical and Trade Schools, and PSC U099, Education/Training- Other. The scope encompasses firefighting and damage control training, including General Shipboard Firefighting (SCBA), Advanced Shipboard Firefighting, General Shipboard Damage Control Training, and Shipboard Firefighting/Damage Control Emergency Team Training.
The contractor is responsible for meeting requirements detailed in the Performance Work Statement, which includes adherence to the NETC High-Risk Training Safety Evaluation (HRTSE) Checklist and firefighting safety protocols. Deliverables and administrative tasks involve monthly reports, government-furnished property (GFP) management, conference minutes, facility modifications, structural integrity surveys, and mishap investigation reporting. The contract also requires the maintenance of training course control documents and compliance with quality assurance surveillance plans.
Bids for this invitation for bid (IFB) were due by May 16, 2022. The solicitation was updated through two amendments which incorporated questions and answers, updated the government-furnished property list, and revised the performance work statement and standard operating procedures for sanitation cabinets. A total of 35 attachments were provided as part of the solicitation package, including wage determinations, bid price forms, and technical manuals. Lisa Mardin is the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.