Name | Type | Posted | Actions |
|---|---|---|---|
7. Document Verification Checklist 8 May 2024.docx | DOCX | May 9, 2024 | |
RFI-05-Solicitation Phase-TP.pdf | May 9, 2024 | ||
Solicitation Amendment FA468624R00030005 SF 30.pdf | May 9, 2024 | ||
REFERENCE ONLY-File Nomenclature.docx | DOCX | May 2, 2024 | |
10. Section L - Instructions, Conditions, and Notices to Offerors 2 May 24.pdf | May 2, 2024 | ||
Solicitation Amendment FA468624R00030004 SF 30.pdf | May 2, 2024 | ||
RFI-04-Solicitation Phase-TP.pdf | May 2, 2024 | ||
Solicitation Amendment FA468624R00030003 SF 30.pdf | Apr 29, 2024 | ||
RFI-03-Solicitation Phase-TP.xlsx | XLSX | Apr 29, 2024 | |
10. Section L - Instructions, Conditions, and Notices to Offerors 29 Apr 24.pdf | Apr 29, 2024 | ||
10. Section L - Instructions, Conditions, and Notices to Offerors 18 Apr 24.pdf | Apr 18, 2024 | ||
RFI-02-Solicitation Phase-TP.pdf | Apr 18, 2024 | ||
Meeting Minutes 04112024-TP GC-MATOC.pdf | Apr 18, 2024 | ||
4. VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company.docx | DOCX | Apr 18, 2024 | |
8. Cost Worksheet-04182024.xlsx | XLSX | Apr 18, 2024 | |
Solicitation Amendment FA468624R00030002 SF 30.pdf | Apr 18, 2024 | ||
Solicitation Amendment FA468624R00030001 SF 30.pdf | Apr 5, 2024 | ||
3. VOL 3-EXPERIENCE-Last 4 Contract Number-Company Name.docx | DOCX | Apr 5, 2024 | |
11. Section M - Evaluation Factors 05 Apr 24.pdf | Apr 5, 2024 | ||
RFI-01-Solicitation Phase-TP.docx | DOCX | Apr 5, 2024 | |
11. Section M - Evaluation Factors 22 Mar 24.pdf | Mar 24, 2024 | ||
0. Solicitation - FA468624R0003 - 24 Mar 24.pdf | Mar 24, 2024 | ||
1. Specifications-CAO 28 FEB 24-TP.pdf | Mar 24, 2024 | ||
2. Self Scoring Worksheet 22 Mar 24.xlsx | XLSX | Mar 24, 2024 | |
3. VOL 3-EXPEREINCE-Last 4 Contract Number-Company Name.docx | DOCX | Mar 24, 2024 | |
4. VOL 3-PAST PERFORMANCE-Last 4 Contract Number-Company.docx | DOCX | Mar 24, 2024 | |
5. VOL 6-RECALL-Last 4 Contract Number-Company Name.docx | DOCX | Mar 24, 2024 | |
6. Contractor Responsibility GSA Form 527.pdf | Mar 24, 2024 | ||
7. Document Verification Checklist.docx | DOCX | Mar 24, 2024 | |
8. Cost Worksheet - 22 Mar 24.xlsx | XLSX | Mar 24, 2024 | |
9. Highest Technically Rated Offeror (HTRO) Guide.docx | DOCX | Mar 24, 2024 | |
10. Section L - Instructions, Conditions, and Notices to Offerors 22 Mar 24.pdf | Mar 24, 2024 | ||
12. WDOL - 23 Feb 24.pdf | Mar 24, 2024 | ||
13. TASK ORDER PROCEDURES - 22 Mar 24.docx | DOCX | Mar 24, 2024 |
Transportation/Paving IDIQ
Contact and place of performance
Makenna Watkins
Beale AFB, CA 95903
USA
Please send all proposals to: [email protected] and [email protected]. If you need a link for submittal, email [email protected] to request one BEFORE day of proposal due date. The last day to submit a RFI was May 8th, 2024, at 1200 PDT. The Contractor shall furnish all design, labor, equipment, material, manufactured articles, transportation, supervision, and all other necessary items t...
View moreThe Department of the Air Force, specifically the FA4686 9 CONS PK, is soliciting proposals for a Transportation and Paving Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The contractor is responsible for furnishing all design, labor, equipment, material, transportation, and supervision required for the design, repair, or construction of airfield and general paving work. Performance will take place at Beale Air Force Base in California. This acquisition is categorized under NAICS 237310 for Highway, Street, and Bridge Construction and PSC Z2LB for the repair or alteration of highways, roads, streets, bridges, and railways.
The solicitation is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit proposals by the response deadline of May 17, 2024. Proposals and requests for submittal links must be sent via email to Makenna Watkins and Theodore Church-Reeves. The solicitation documentation includes 34 attachments, such as past performance templates, cost worksheets, a document verification checklist, and several amendments detailing Request for Information (RFI) responses and updated instructions for proposal volumes and file nomenclature.
The evaluation process incorporates past performance through Contractor Performance Assessment Reporting System (CPARS) ratings or Past Performance Questionnaires (PPQ) when CPARS are unavailable. Specific administrative requirements for proposal submission include a self-scoring worksheet and the inclusion of Clause 52.223-2 regarding the affirmative procurement of biobased products. The final window for submitting RFIs concluded on May 8, 2024. All technical specifications for the required airfield and paving combinations are provided in the associated solicitation attachments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.