Name | Type | Posted | Actions |
|---|---|---|---|
Q_A_on_Final_RFP_Posted_02_May_19.pdf | May 2, 2019 | ||
Attachment_4.pdf | Apr 25, 2019 | ||
FA850919R0002_______0003.pdf | Apr 25, 2019 | ||
Revised_Q_A_on_Final_RFP_through_22_Apr_19.pdf | Apr 22, 2019 | ||
Q_A_on_Final_RFP_through_22_Apr_19.pdf | Apr 22, 2019 | ||
Attachment_8.pdf | Apr 18, 2019 | ||
FA850919R0002_______0002.pdf | Apr 18, 2019 | ||
Attachment_7.pdf | Apr 18, 2019 | ||
Q&A_on_Final_RFP.pdf | Apr 15, 2019 | ||
Attachment_10.pdf | Apr 15, 2019 | ||
FA850919R0002_______0001.pdf | Apr 15, 2019 | ||
Attachment_2.pdf | Apr 15, 2019 | ||
Attachment_4.pdf | Apr 15, 2019 | ||
Attachment_11.pdf | Apr 15, 2019 | ||
Attachment_7.pdf | Apr 15, 2019 | ||
Attachment_8.pdf | Mar 29, 2019 | ||
Attachment_6.pdf | Mar 29, 2019 | ||
Attachment_7.pdf | Mar 29, 2019 | ||
Attachment_2.pdf | Mar 29, 2019 | ||
FA850919R0002.pdf | Mar 29, 2019 | ||
Attachment_1.pdf | Mar 29, 2019 | ||
Attachment_4.pdf | Mar 29, 2019 | ||
Attachment_9.pdf | Mar 29, 2019 | ||
Attachment_5.pdf | Mar 29, 2019 | ||
Attachment_3.pdf | Mar 29, 2019 | ||
Draft_RFP_Industry_Questions_Rev_1_28_Feb_2019.pdf | Feb 28, 2019 | ||
Draft_RFP_Industry_Questions_Posted_23_JAN_2019.pdf | Jan 23, 2019 | ||
Pre-solicitation_Conference_Attendees.pdf | Dec 20, 2018 | ||
Class_Deviation_2018-O0006_Evaluation_Factors_for_Certain_Multiple_Award....pdf | Dec 18, 2018 | ||
Pre-Solicitation_Conference_Q&A.pdf | Dec 17, 2018 | ||
SOW_MACM_IDIQ_Contract_Draft_(17_Dec_2018).pdf | Dec 17, 2018 | ||
Draft_Clauses_and_Provisions.pdf | Dec 17, 2018 | ||
FW_MACM_IDIQ_Sample_Task_Draft.docx | DOCX | Dec 17, 2018 | |
MACM_IDIQ_M.900_-_Section_M_Draft.doc | DOC | Dec 17, 2018 | |
Draft_CLIN_Structure.pdf | Dec 17, 2018 | ||
RW_MACM_IDIQ_Final_Sample_Task_Draft.docx | DOCX | Dec 17, 2018 | |
MACM_IDIQ_L.900_-_Section_L_Draft.doc | DOC | Dec 17, 2018 | |
Draft_Statement_of_Work_23_Oct_2017.pdf | Nov 15, 2018 | ||
DRAFT_RW_Section_L.docx | DOCX | Nov 15, 2018 | |
DRAFT_FW_Section_M.docx | DOCX | Nov 15, 2018 | |
DRAFT_-_MACM_IDIQ_Rotary_Sample_Task.docx | DOCX | Nov 15, 2018 | |
DRAFT_-_MACM_IDIQ_Fixed_Wing_Sample_Task.docx | DOCX | Nov 15, 2018 | |
DRAFT_FW_Section_L.docx | DOCX | Nov 15, 2018 | |
DRAFT_RW_Section_M.docx | DOCX | Nov 15, 2018 |
Special Operation Forces Multiple Award Contract for Modifications
Special Operation Forces Multiple Award Contract for Modifications
Contact and place of performance
Amanda S. Ragan
Not specified
02 May 2019 Questions and Answers received on the final RFP documents have been updated. Please see attached PDF titled Q&A on Final RFP through 02 May 19. New questions and answers begin with Question 33. 25 Apr 2019 Amendment FA8509-19-R-0002-0003 and applicable attachment are attached to this solicitation to correct a minor typographical error in Attachment 4. Additionally,Mrs. Amanda Ragan will be available at th...
View moreThe Special Operation Forces Multiple Award Contract for Modifications (MACM) provides modification and sustainment support for Special Operations Forces/Personnel Recovery (SOF/PR) and Rotary managed C-130, H-1, and H-60 aircraft. Managed by the Department of the Air Force at Robins Air Force Base, the scope includes integrated weapon systems, subsystems, and associated support equipment. Requirements involve non-recurring engineering, integration, trial and kit proof installations, aircraft technical data packages, provisioning, and test support. Additionally, the contract covers the development of airworthiness and cybersecurity documentation, installation of aircraft modification kits, Interim Contractor Support (ICS), manufacturing, and full-rate kit production.
This solicitation is categorized under NAICS 336411 for Aircraft Manufacturing and PSC code K. It is designated as an SBA Small Business Administration (SBA) set-aside. The government intends to establish two separate pools of awardees: Pool A for Fixed Wing and Pool B for Rotary Wing. Offerors are permitted to propose for one or both pools using a singular proposal that differentiates between the requirements for each. Proposals are evaluated based on technical acceptability as outlined in the solicitation instructions.
The deadline for proposal submission is May 6, 2019, at 5:00 PM EST. Formal delivery of proposals is coordinated through Amanda S. Ragan at the Robins Air Force Base Visitor’s Center in Warner Robins, Georgia. The solicitation includes 44 attachments, which encompass the formal Request for Proposal (RFP), draft and final Statements of Work, multiple amendments for administrative and typographical corrections, and several rounds of compiled questions and answers derived from pre-solicitation conferences and industry inquiries.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.