Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 3, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 3, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 3, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=GUARNGCFMOPN140009¬iceType=SourcesSought | LINK | Jun 3, 2025 |
Sources Sought Notice, Design-Build Construction: Unheated Warehouse Facility, Guam Army National Guard
Sources Sought Notice, Design-Build Construction: Unheated Warehouse Facility, Guam Army National Guard
Contact and place of performance
JOSEPH MAFNAS
Barrigada, GU 96913
USA
This is a Sources Sought Notice issued solely for market research and planning purposes. The USPFO for Guam, Purchasing and Contracting Division, is conducting a market survey to determine if there is a reasonable number of qualified small business concerns capable of performing the following construction requirement. This requirement is for the Design-Build construction of an unheated warehouse facility totaling 6,1...
View moreThe Department of the Army, USPFO Activity GU ARNG, is conducting market research to identify qualified small business concerns for the design and construction of an unheated warehouse facility in Barrigada, Guam. This Sources Sought notice, identified by solicitation number GUARNGCFMOPN140009, involves the Design-Build of a 6,120-square-foot non-standard Organizational Storage Building of permanent construction. The project is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1GZ for Construction of Other Warehouse Buildings. The estimated construction magnitude is between $1,000,000 and $5,000,000, with a performance period of 900 calendar days.
The scope of work includes the delivery of all utility services, information systems, fire detection and alarm systems, and site improvements such as roads, curbs, gutters, storm drainage, and parking areas. The facility must be designed for a minimum 50-year lifespan in accordance with Unified Facilities Code 1-200-02 and must achieve LEED Silver certification. Construction will incorporate sustainable design features, accessible design for individuals with disabilities, and Antiterrorism Force Protection measures. This project serves as a direct replacement for existing infrastructure and complies with 1-for-1 square footage disposal requirements.
Responses to this notice are due by June 30, 2025, and will assist the government in determining the appropriate acquisition strategy and feasibility of a small business set-aside. Interested firms, including 8(a), HUBZone, Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses, must submit a capability statement including company identifiers, business classification, relevant experience, and bonding capacity to Joseph Mafnas. The primary place of performance is the Guam Army National Guard Barrigada Readiness Center.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.