Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 17, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 17, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 17, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9123726QA036¬iceType=SolicitationNotice | LINK | Mar 17, 2026 |
W91237-26-Q-A036 PCS Gearbox Fabrication
Contact and place of performance
Ellec Robinette
45612
Contractor shall be responsible for all work required to fabricate, test and deliver two (2) speed reducers and appurtenances as specified within the Statement of Work to Paint Creek Lake, 504 Reservoir Road Bainbridge, Ohio 45612, within 20 weeks after notice to proceed.
The Department of the Army, Corps of Engineers Huntington District, issued solicitation W9123726QA036 for the fabrication of PCS gearboxes. The selected contractor is responsible for all work required to fabricate, test, and deliver two speed reducers and associated appurtenances to Paint Creek Lake in Bainbridge, Ohio. This requirement is categorized under NAICS 332710 for Machine Shops and PSC J054 for Maintenance, Repair, and Rebuild of Equipment-Prefabricated Structures and Scaffolding.
The project operates under a Small Business Administration (SBA) set-aside. All deliverables must be completed and delivered to the project site within 20 weeks following the issuance of the notice to proceed. One PDF attachment was included with the solicitation notice published on March 17, 2026.
Submissions for this solicitation are due by March 30, 2026. The primary point of contact for this requirement is Ellec Robinette. All work must strictly adhere to the specifications detailed within the government's Statement of Work.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.