Name | Type | Posted | Actions |
|---|---|---|---|
ATT 1 - Updated Statement of Work 5-28-26.pdf | Jun 1, 2026 | ||
Bldg 158_530_708_712 and 926 fence replacement SOW modified 5-6-26.pdf | May 7, 2026 | ||
ATT 3 - SCA Wage Determination.pdf | May 5, 2026 | ||
ATT 2 - Provisions and Clauses.pdf | May 5, 2026 | ||
B158_B530_B708_B712_B926 Fence Replacement Combo.pdf | May 5, 2026 | ||
ATT 5 -EAL Form.pdf | May 5, 2026 | ||
ATT 1 - Statement of Work.pdf | May 5, 2026 | ||
ATT 4 - DAF Contracting Compass.pdf | May 5, 2026 |
B158_B530_B708_B712_B926 Fence Replacement
The 14th Contracting Squadron at Columbus Air Force Base is seeking quotes for the design, installation, and removal of fencing at five base facilities. This project, solicitation number FA302226Q0316, covers work at Base Supply (Building 158), the Thrift Store (Building 530), Kaye Auditorium (Building 708), the Base Chapel (Building 712), and the Security Forces Building (Building 926). The contractor must provide all management, tools, supplies, equipment, and labor. This is a small business set-aside under NAICS code 238990, and the government will use Lowest Price Technically Acceptable (LPTA) criteria for evaluation. Quotes and capability statements are due by June 11, 2026. The performance period is 60 days from the start of work, and all materials must be contractor-furnished. The Statement of Work was updated on May 28, 2026, to provide specific linear footage and gate configurations for each site. Other required documents include the Provisions and Clauses, a Service Contract Act Wage Determination for Mississippi, and the Entry Authorization Listing for base access. The Statement of Work has been updated to clarify linear footage and gate requirements for each building. All materials must be provided by the contractor, and the fence must be 6-foot brown vinyl-coated chain link with slats. The project has a 60-day performance period. Contractors must follow Department of the Air Force Occupational Safety and Health (AFOSH) standards and base access protocols.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
McGil Jan Sabado
MS 39705
USA
Update 2: Added revised Statement of Work in the attachment section. ________________________________________________________________________________________________________ Update 1: Added revised Statement of Work in the attachment section. ________________________________________________________________________________________________________ The Contractor shall provide all management, tools, supplies...
View more
Identification: All attendees must bring a valid photo ID. Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors center at 9:00 AM.
Factors being utilized to evaluate proposals are: