Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 2, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 2, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 2, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HN26BA008¬iceType=Presolicitation | LINK | Jun 2, 2026 |
FY26 Brunswick Inner Harbor Dredging Project
Contact and place of performance
Rohan Bryan
Not specified
THIS IS A PRE-SOLICITATION: This acquisition is being offered as a 100% Small Business Set Aside and will result in a Firm Fixed Price Contract Award. The Brunswick Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally perfor...
View moreThe Department of the Army, Savannah District, has issued a pre-solicitation for the FY26 Brunswick Inner Harbor Dredging Project under solicitation number W912HN26BA008. This project provides construction services for maintenance dredging within the Brunswick Harbor deep draft navigation project in Glynn County, Georgia. The selected contractor will furnish all personnel, transportation, equipment, and materials required to remove approximately 835,000 cubic yards of maintenance material using a hydraulic cutterhead dredge. Dredging operations will primarily occur in the East River, South Brunswick River, Lower Turtle River, and Brunswick River, with all removed material being placed in the Andrews Island Dredged Material Containment Area.
This acquisition is designated as a 100% SBA Small Business Set-Aside and will result in a firm-fixed-price contract. The work is classified under NAICS 237990 Other Heavy and Civil Engineering Construction and PSC Z1KF MAINTENANCE OF DREDGING FACILITIES. Performance is expected to last 120 days from the notice to proceed, with dredging typically scheduled for the late summer or fall. One PDF attachment was included with the notice published on June 2, 2026.
The response deadline for this pre-solicitation is June 15, 2026. Interested parties may reference the primary point of contact, Rohan Bryan, for further information. The project location is situated 70 miles south of Savannah Harbor and 25 miles north of Fernandina Harbor, specifically targeting channel depths of 36 feet through St. Simon Sound and the associated river systems.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.