Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment FA812826RB0010001 SF 30.pdf | Apr 7, 2026 | ||
EAC Remanufacture SOW (final) 2025.09.25.pdf | Mar 6, 2026 | ||
EAC Phase 3 CDRL Package v1.1.pdf | Mar 6, 2026 | ||
Solicitation - FA812826RB001.pdf | Mar 6, 2026 | ||
EAC afmc-158 - Packaging.pdf | Mar 6, 2026 | ||
EAC - dd1653 - Transportation.pdf | Mar 6, 2026 | ||
EAC_P3_GFP.pdf | Mar 6, 2026 |
Air Launched Cruise Missile (ALCM) Elevon Actuator Controller Phase III Remanufacture
Contact and place of performance
Natalie Stokely
Heath, OH 43056
USA
THIS SOLICITATION NOTIFICATION OF THE GOVERNMENT'S INTENT TO AWARD A SOLE SOURCE CONTRACT. IAW MP 5332.7 Funds Availability "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under until funds are available. The Government reserves the right to not solicit this requirement or cancel the solicitation after issuance, either before or after th...
View moreDescription
Contractor will remanufacture the ALCM EAC component, The contractor will provide the disassembly, cleaning, inspection, maintenance, reassembly, testing, and finishing actions then return each unit to the Government in a like new condition. Each unit will maintain form, fit, and function of the original configuration. Additionally, thew contractor will produce EAC Production Test Sets and associated Test Program Sets to support production. The purpose of this solicitation is to notify industry of the Air Forces' intent to award a Sole Source contract directed toward the Boeing Company, in its Boeing Guidance and Repair Center (BGRC) (Cage Code: 05HA6), the only qualified source. No foreign participation is anticipated.
CONTRACT TYPE, PERIOD OF PERFORMANCE AND SMALL BUSINESS SUBCONTRACTING
The current acquisition strategy is to issue an IDIQ, definitive contract, one 1-year ordereing and three 2-year ordering periods. The IDIQ will contain negotiated Delivery Orders. This effort will seek to utilize Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Cost Reimbursement (CR), and Cost Plus Incentive Fee (CPIF) contract types, to be determined through negotiations by the PCO. The contemplated period of performance is July 2026 to July 2033. The Government has determined that this effort will not be small business set-aside. The contractor will be required to meet all small business participation requirements included in the contract and fulfill all requirements of the subcontracting plan included in the contract.
CONTRACTING OFFICE POC
Name: Natalie Stokely
Office: AFNWC/PZNT
Phone: (918)429-3748
Email: [email protected]
The Department of the Air Force, AFNWC/PZN, has issued solicitation FA812826RB001 for the Air Launched Cruise Missile (ALCM) Elevon Actuator Controller (EAC) Phase III Remanufacture. This requirement involves the disassembly, cleaning, inspection, maintenance, reassembly, testing, and finishing of EAC components to return them to the government in like-new condition. The contractor is also responsible for producing EAC Production Test Sets and associated Test Program Sets to support production, ensuring each unit maintains the form, fit, and function of its original configuration. Performance will take place in Heath, Ohio.
The government intends to award a sole-source Indefinite Delivery/Indefinite Quantity (IDIQ) contract to The Boeing Company at its Boeing Guidance and Repair Center. The anticipated acquisition structure includes one one-year ordering period and three two-year ordering periods, spanning a performance window from July 2026 to July 2033. Contract types may include Firm Fixed Price, Cost Plus Fixed Fee, Cost Reimbursement, and Cost Plus Incentive Fee. This solicitation is not a small business set-aside, and the requirement is classified under NAICS 336419, Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing, and PSC 1420, GUIDED MISSILE COMPONENTS.
Responses are due by May 18, 2026. This effort is subject to the availability of funds, and the government reserves the right to cancel the solicitation before or after the closing date. As of April 7, 2026, the solicitation includes seven attachments, featuring the Statement of Work, Contract Data Requirements List (CDRL) package, packaging and transportation specifications, and a solicitation amendment. The primary point of contact for this requirement is Natalie Stokely.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.