Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 2e - AEDC Design Review Flow and Expectations.pdf | Jun 13, 2025 | ||
Attachment 2 - Technical Requirements Document_Amend2.pdf | Jun 13, 2025 | ||
Attachment 12 L-8 - Requirements Matrix_Amend2.pdf | Jun 13, 2025 | ||
Attachment 4 Section L_Amend2.pdf | Jun 13, 2025 | ||
Solicitation Amendment FA910125RB0010002 SF 30.pdf | Jun 13, 2025 | ||
Attachment 1 - Statement of Objectives_Amend2.pdf | Jun 13, 2025 | ||
Attachment 14 Section M_Amend2.pdf | Jun 13, 2025 | ||
Solicitation Amendment FA910125RB0010001 SF 30.pdf | May 22, 2025 | ||
Raw Water Analysis Report 7-13-12.pdf | May 20, 2025 | ||
FA910125RB001 Facility Exhaust System QandA 20May25.pdf | May 20, 2025 | ||
Attachment 2b - Reference Drawings.pdf | Apr 16, 2025 | ||
Attachment 2 - Technical Requirements Document.pdf | Apr 16, 2025 | ||
Attachment 1 - Statement of Objectives.pdf | Apr 16, 2025 | ||
Solicitation - FA910125RB001.pdf | Apr 16, 2025 | ||
Facility Exhaust System RFP Cover Letter.pdf | Apr 16, 2025 | ||
Attachment 2a - Exhaust Boundary Utility Interface.pdf | Apr 16, 2025 | ||
Attachment 11 L-7 Initial Order Pricing Sheet.xlsx | XLSX | Apr 16, 2025 | |
Attachment 3 - DD1423 CDRL Template.pdf | Apr 16, 2025 | ||
Attachment 5 L-1 PPI Tool Instructions.pdf | Apr 16, 2025 | ||
Attachment 14 Section M.pdf | Apr 16, 2025 | ||
Attachment 13 L-9 SB Participation Commitment Document.pdf | Apr 16, 2025 | ||
Attachment 12 L-8 - Requirements Matrix.pdf | Apr 16, 2025 | ||
Attachment 10 L-6 Relevancy Matrix.xlsx | XLSX | Apr 16, 2025 | |
Attachment 9 L-5 Subcontractor Consent Letter.pdf | Apr 16, 2025 | ||
Attachment 7 L-3 PPQ Cover Letter.pdf | Apr 16, 2025 | ||
Attachment 6 L-2 Past and Present Performance Questionnaire.pdf | Apr 16, 2025 | ||
Attachment 2d - Design Submittal Requirements.pdf | Apr 16, 2025 | ||
Attachment 2c - SHE and Eng Standards.pdf | Apr 16, 2025 | ||
Attachment 4 Section L.pdf | Apr 16, 2025 | ||
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 16, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 16, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Apr 16, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=FA910125RB001 | LINK | Apr 16, 2025 |
Facility Exhaust System
Contact and place of performance
Haley Smith
Arnold AFB, TN 37389
USA
13 June 2025 - Amendment 2 is issued revising RFP attachments and extending the proposal due date to 30 June 2025. ***************************************************************************** 22 May 2025 - Amendment 0001 is issued extending the proposal due date for all proposal volumes, including Past Performance, to no later than 16 June 2025 at 2:00pm Central Time. Amendment 0002, incorporating changes from the Q...
View moreThe Department of the Air Force, specifically the Air Force Test Center Arnold Engineering Development Complex, is soliciting proposals for the design, procurement, and installation of a new facility exhaust system at Arnold Air Force Base, Tennessee. This acquisition is categorized under NAICS 333248, All Other Industrial Machinery Manufacturing, and PSC 4310, Compressors and Vacuum Pumps. The government intends to award a single, firm-fixed-price requirements contract with a five-year ordering period through full and open competition. Performance is restricted to U.S. citizens or entities in compliance with export-control regulations, and offerors must certify they are not subject to foreign ownership or control.
Responses are due by June 30, 2025, at 2:00 p.m. Central Time. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment and remain valid for at least 90 days. The solicitation, identified as FA910125RB001, includes 29 attachments such as a Statement of Objectives, Technical Requirements Document, and AEDC Design Review Flow and Expectations. While the solicitation is active, award is subject to the availability of funds. Haley Smith serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.