Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 15, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 15, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 15, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DR26RA030¬iceType=SolicitationNotice | LINK | Apr 15, 2026 |
Unaccompanied Enlisted Personnel Housing (UEPH), Joint Base Myers Henderson-Hall (JBMHH), Fort Myer, Virginia
Contact and place of performance
Amber Rose
22211
Unaccompanied Enlisted Personnel Housing (UEPH), Joint Base Meyer-Henderson Hall (JBMHH), Virginia. The US Army Corps of Engineers, Baltimore District intends to solicit for an award to construct standard design barracks to include living quarter suites to accommodate 200 Soldiers, clothes, steam and barber rooms. Primary facilities include cybersecurity and antiterrorism/force protection (AT/FP) measures, building i...
View moreThe U.S. Army Corps of Engineers, Baltimore District, has issued solicitation W912DR26RA030 for the construction of Unaccompanied Enlisted Personnel Housing (UEPH) at Joint Base Myer-Henderson Hall in Virginia. The project requires the construction of standard design barracks to accommodate 200 soldiers, including living quarter suites, clothes pressing rooms, steam rooms, and barber rooms. The scope encompasses comprehensive building and furnishing design services, site development, and the demolition of 16 existing buildings totaling 30,897 square feet. Facilities must be designed for a minimum 40-year life cycle in accordance with Unified Facilities Criteria and include cybersecurity, antiterrorism/force protection measures, fire protection, and energy monitoring control systems.
This requirement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1FC for Construction of Troop Housing Facilities. Supporting infrastructure includes the installation of self-contained heating and air conditioning systems with an estimated 420-ton capacity, storm drainage, paving, parking, and landscaping. The period of performance is 1,460 calendar days following the Notice to Proceed.
Proposals are due by 11:00 AM EDT on June 11, 2026, following a series of amendments that extended the original deadline and provided revised specifications, drawings, and supplemental price schedules. Available documentation includes one PDF attachment containing the solicitation, redacted justification and approval, site visit sign-in sheet, and technical reports. Amber Rose serves as the point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.