Name | Type | Posted | Actions |
|---|---|---|---|
RFP W15QKN-25-R-0004 - Industry Question Set 4 - 6 May 2025.pdf | May 6, 2025 | ||
RFP W15QKN-25-R-0004 - Industry Question Set 3 - 21 Apr 2025.pdf | Apr 21, 2025 | ||
RFP W15QKN-25-R-0004 - Industry Question Set 2 - 11 Apr 2025.pdf | Apr 11, 2025 | ||
RFP W15QKN-25-R-0004 - Industry Question Set 2 - 10 Apr 2025.pdf | Apr 10, 2025 | ||
RFP W15QKN-25-R-0004 - Industry Question Set 1.pdf | Apr 8, 2025 | ||
R24Q2024_mortar_fin_specs_contractor_r1 (002).pdf | Apr 3, 2025 | ||
P24C12_00.zip | ZIP | Apr 3, 2025 | |
P24C13_00.zip | ZIP | Apr 3, 2025 | |
P24C11_00.zip | ZIP | Apr 3, 2025 | |
P24C14_00.zip | ZIP | Apr 3, 2025 | |
R19K2023.zip | ZIP | Apr 3, 2025 | |
11726889-P24C11.zip | ZIP | Apr 2, 2025 | |
9327831-P24C13.zip | ZIP | Apr 2, 2025 | |
12577519-P24C14.zip | ZIP | Apr 2, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 27, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 27, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 27, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W15QKN25R0004 | LINK | Mar 27, 2025 |
60mm (M27), 81mm (M24 and M28), 120mm (M31) Mortar Tail Fins
60mm (M27), 81mm (M24 and M28), 120mm (M31) Mortar Tail Fins
Contact and place of performance
Michael Kline
Not specified
28 May 2025:The purpose of this Notice revision is to post the released Amendment 0004 under Request for Proposal (RFP) W15QKN-25-R-0004. The purpose of Amendment 0004 is to extend the RFP response date FROM Wednesday, 28 May 2025, 2:00 pm Eastern Daylight Time (EDT) TO Monday, 9 June 2025, 1:00 pm Eastern Daylight Time (EDT). Note: This will be the last proposal extension for this Solicitation.----------------------...
View moreThe U.S. Army Contracting Command-New Jersey (ACC-NJ), acting for the Project Manager, Combat Ammunition Systems, is soliciting proposals under solicitation W15QKN25R0004 for the manufacture, testing, packaging, and delivery of mortar tail fins. This requirement includes the production of 60mm M27, 81mm M24 and M28, and 120mm M31 tail fin variants, which serve as essential components for high explosive, full-range practice, illumination, and smoke mortar cartridges. This procurement is a total SBA; SBA set-aside classified under NAICS code 332993, Ammunition (except Small Arms) Manufacturing, and PSC 1315, AMMUNITION, 75MM THROUGH 125MM.
The scope of work involves technical manufacturing processes for several distinct aluminum fin assemblies. The M27 is a one-piece assembly with six canted blades and a hollow center for ignition cartridge insertion. The M24 and M28 variants utilize a two-piece design where a fin component is pressed onto a housing component; both models are anodized and must pass specific salt spray testing for first article and production units. The M31 variant is an eight-bladed, two-piece assembly machined from aluminum extrusions with a hollowed tube center to accommodate 120mm mortar items. Manufacturing requirements include extrusion, machining, drilling flash holes, and anodizing according to military standards.
Proposals are due by June 9, 2025, at 1:00 pm Eastern Daylight Time. This deadline was established following a series of amendments that incorporated four industry question sets and updated various contract data requirements and drawings. There are 14 attachments associated with this notice, including technical specifications, industry responses, and the formal request for proposal. The primary place of performance is centered at Picatinny Arsenal, New Jersey.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.