Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W90VN726RA016¬iceType=CombinedSynopsisSolicitation | LINK | Apr 30, 2026 |
CY26LCS, MATOC NON-WORK PLAN, W90VN726RA016, Upgrade Drainage
Contact and place of performance
KYONG KO
Not specified
CY26 LCS, MATOCLCS NON-WORK PLAN TASK ORDER_UPGRADE DRAINAGE AROUND B2035, KUNSAN AB.The contractor shall provide all supervision, labor, tools, parts, materials and transportation necessary to provide service as stated in the Statement of Work and Drawings herein.
The Department of the Army, through the 630th Support Detachment, has issued a combined synopsis and solicitation under requirement number W90VN726RA016 for the upgrade of drainage around building B2035 at Kunsan Air Base. This task order, organized under a Multiple Award Task Order Contract (MATOC) non-work plan, requires the contractor to provide all supervision, labor, tools, parts, materials, and transportation necessary to perform the services detailed in the associated statement of work and drawings.
The project is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z1NZ for Maintenance of Other Utilities. Submissions in response to this notice must be received by May 22, 2026. Kyong Ko serves as the point of contact for this requirement, which includes one unnamed PDF attachment released on April 30, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.