Name | Type | Posted | Actions |
|---|---|---|---|
C.04.Official Bid Abstract_Multiple Bids_Stone Repairs.pdf | Apr 23, 2025 | ||
B.08.Solicitation - W912EE25BA0040001.pdf | Mar 27, 2025 | ||
B.08.Solicitation - W912EE25BA004.pdf | Mar 24, 2025 | ||
B.08.Solicitation Drawings_FY25 Stone Repairs.pdf | Mar 21, 2025 | ||
B.08.Solicitation - W912EE25BA004.pdf | Mar 21, 2025 |
MS RIVER MI 616-326 STONE REPAIRS TO REVETMENTS AND DIKES, FY25 FC/MR&T, MS RIVER BASIN, CHANNEL IMPROVEMENT PROGRAM INDEFINITE DELIVERY/INDEFINITE QUANTITY, (IDIQ)
Contact and place of performance
Kasey Davis
Vicksburg, MS 39180
USA
**4/23/25 - Official Bid Abstract has been attached to solicitation.** Amendment 1 has been made on 27 March 2025 to revise the ProjNet Bidder Inquiry key within the instructions in the solicitation. No other changes have been made. The cumulative capacity of the resulting Indefinite Delivery Indefinite Quantity (IDIQ) contract is $30,000,000.00, with an $8,000,000.00 minimum guarantee. W912EE - Description of Work:...
View moreThe US Army Corps of Engineers Vicksburg District is soliciting for an Indefinite Delivery Indefinite Quantity contract for stone repairs to revetments and dikes on the Mississippi River between Miles 616 and 326 A.H.P. This procurement is classified under NAICS 237990 Other Heavy and Civil Engineering Construction and PSC Y1PZ Construction of Other Non-Building Facilities. The resulting contract has a cumulative capacity of $30,000,000.00 and includes a minimum guarantee of $8,000,000.00. Performance takes place in Vicksburg, Mississippi, and surrounding river locations, where conditions include varying water depths and currents ranging from one to six miles per hour.
The scope of work requires furnishing all plant, labor, materials, and equipment to perform grading, earth or sand fill, subgrade excavation, stone paving, stonefill, and subaqueous stone placement. Additional tasks include removing and breaking out pavement, rearranging disarranged concrete paving, and degrading stone along revetments or stone bendway weirs. Contractors are responsible for repairing dikes through stone fill placement and protection, as well as maintaining environmental protection throughout the project. Extensive stone repairs are required at specific dike locations.
The response deadline for solicitation W912EE25BA004 was April 22, 2025, with Kasey Davis serving as the point of contact. Supporting documentation includes five attachments: an official bid abstract posted on April 23, 2025, solicitation drawings, and multiple versions of the solicitation. Amendment 1 was issued on March 27, 2025, specifically to revise the ProjNet Bidder Inquiry key within the solicitation instructions.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.