Name | Type | Posted | Actions |
|---|---|---|---|
12577520 Tube - Distribution Code D.pdf | Jan 4, 2022 | ||
W52P1J22R0007 Amend 0004 January 04 2022.pdf | Jan 4, 2022 | ||
22-R-0007 ECPs - Distribution Code F Export Controlled 13 DEC 2021.zip | ZIP | Dec 13, 2021 | |
B08-Attachment 0011-GFM Listing updated December 08 2021.xlsx | XLSX | Dec 13, 2021 | |
W52P1J-22-R-0007- Amend 0003 December 13 2021.pdf | Dec 13, 2021 | ||
W52P1J22R0007-0002 November 18 2021.pdf | Nov 18, 2021 | ||
B08-Attachment 0011-GFM Listing updated November 16.xlsx | XLSX | Nov 18, 2021 | |
B08-Attachment 0001-60mm 81mm 120mm Price Matrix updated November 16 2021 (1).xlsx | XLSX | Nov 18, 2021 | |
W52P1J22R0007-0001 November 15 2021.pdf | Nov 15, 2021 | ||
B08 - Attachment 0003 - Past Performance Questionaire udated November 15 2021 (signed).pdf | Nov 15, 2021 | ||
Exhibit A-CDRL.pdf | Oct 29, 2021 | ||
B08-Attachment 0002-Small Business Participation.docx | DOCX | Oct 28, 2021 | |
22-R-0007 ECPs - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
B08-Attachment 0010-CDRL Guidance.pdf | Oct 28, 2021 | ||
B08-Attachment 0004-OPSEC SOW.pdf | Oct 28, 2021 | ||
B08-Attachment 0007-Configuration Change Management SOW.pdf | Oct 28, 2021 | ||
13028737-P21C07 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
B08-Attachment 0011-GFM Listing.xlsx | XLSX | Oct 28, 2021 | |
B08-Exhibit A-CDRL.pdf | Oct 28, 2021 | ||
B08-W52P1J22R0007 HE LAP Solicitation- 28 Oct.pdf | Oct 28, 2021 | ||
13028739-P21C06 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
13013654-P21C08 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
12977144-P21C09 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
13038142-P21C10 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
13038140-P21C11 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
13044446-P21C04 - Distribution Code B Export Controlled.zip | ZIP | Oct 28, 2021 | |
13064708-P21C03 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
13031777-P21C05 - Distribution Code D Export Controlled.zip | ZIP | Oct 28, 2021 | |
13008611-P21C13.zip | ZIP | Oct 28, 2021 | |
13095897-P21C14.zip | ZIP | Oct 28, 2021 | |
13095896-P21C15.zip | ZIP | Oct 28, 2021 | |
B08-Attachment 0003-Past Performance Questionaire.docx | DOCX | Oct 28, 2021 | |
B08-Attachment 0001-60mm 81mm 120mm Price Matrix.xlsx | XLSX | Oct 28, 2021 | |
B08-Attachment 0009-Accountability Instructions SOW.pdf | Oct 28, 2021 | ||
B08-Attachment 0005-OPSEC Security Plan Sample.pdf | Oct 28, 2021 | ||
B08-Attachment 0008-Light and Medium Phosphate Coating.pdf | Oct 28, 2021 | ||
B08-Attachment 0006-HE LAP SOW.pdf | Oct 28, 2021 |
60mm 81mm 120mm High Explosive Load, Assemble, Pack (HE LAP)
60mm 81mm 120mm High Explosive Load, Assemble, Pack (HE LAP)
Contact and place of performance
Adam Marc Geneva
Not specified
Please see attached solicitation, solicitation attachments, and Technical Data Packages (TDP). Please note the closing date of the soliciation. Amendment 0001-November 15, 2021. Updated close date, solictation changes, (Q+A 1), and Attachment 0003 correction. Amendment 0002-November 18, 2021. solictation changes, (Q+A 2), and Attachment 0001 and 0011 corrections Amendment 0003-December 13, 2021. Updated close date, solictation changes, (Q+A 3), and Attachment 0011 corrections and ECPS additions. Amendment 0004-January 04, 2022. Added Tube Drawing and Q+A 4.
The U.S. Department of the Army, through the USA Joint Munitions Command, issued solicitation W52P1J22R0007 for the loading, assembling, and packing (LAP) of 60mm, 81mm, and 120mm high explosive ammunition. This requirement is categorized under NAICS code 332993, Ammunition (except Small Arms) Manufacturing, and PSC 1315, Ammunition, 75mm through 125mm. Adam Marc Geneva serves as the point of contact for this procurement, which is documented through 37 attachments including technical data packages, engineering change proposals, and government-furnished material listings.
The solicitation has undergone multiple revisions, including Amendment 0004 issued on January 4, 2022, which incorporated additional tube drawings and responses to inquiries. Previous amendments adjusted the closing date, modified solicitation terms, and updated various attachments such as the GFM listing. Responses for this opportunity are due by January 19, 2022.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.