Name | Type | Posted | Actions |
|---|---|---|---|
Abstract OF1419-W912HV26BA010_FINAL..pdf | May 22, 2026 | ||
Hangar_Demolition_Site_Visit_Roster_W912HV26BA010.pdf | Mar 10, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Feb 19, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Feb 19, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Feb 19, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HV26BA010¬iceType=SolicitationNotice | LINK | Feb 19, 2026 |
Demolition of Maintenance Hangar, Building 3542, Kadena Air Base, Okinawa, Japan
Demolition of Maintenance Hangar, Building 3542, Kadena Air Base, Okinawa, Japan
Contact and place of performance
Norman Roldan
96376
Abstract of Offerors 1419 is attached.
Issuing Amendment No. 0003 dated 11 May 2026. Issuing Amendment No. 0002 dated 29 April 2026. Clause 52.222-90, Addressing DEI Discrimination by Federal Contractors (Deviation 2026-O0038) will be deleted by AM-0003. Issuing Amendment No. 0001 dated 17 April 2026 - Revised Specifications and Drawings and other attachments. Demolition of Maintenance Hangar, Building 3542, Kadena Air Base, Okinawa, Japan As-builts are for Information only and will not be part of the contract. Please follow the link to PIEE to see all the attachments.
The U.S. Army Corps of Engineers, Japan District (W2SN ENDIST JAPAN), issued this solicitation for the demolition of Maintenance Hangar Building 3542 located at Kadena Air Base in Okinawa, Japan. Identified under solicitation number W912HV26BA010, the project involves construction services categorized under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1BZ for Construction of Other Airfield Structures. The scope of work includes the full demolition of the hangar structure as detailed in the provided specifications and drawings, though original as-built documents are supplied for informational purposes only and do not constitute part of the formal contract.
Administrative actions for this requirement included the issuance of three amendments to revise specifications, drawings, and other attachments, as well as the removal of specific clauses regarding diversity, equity, and inclusion discrimination. The solicitation process concluded with a final response deadline of May 22, 2026. The associated project documentation includes three attachments: a final abstract of offerors, a site visit roster, and an additional project document. All formal communication for this requirement is managed by the point of contact, Norman Roldan.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.