Name | Type | Posted | Actions |
|---|---|---|---|
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W90VN725RA021 | LINK | Mar 4, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 4, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 4, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 4, 2025 |
CY25 LCS, MATOC WP_ Repair Railroad, Various Area, Kunsan AB.
Contact and place of performance
KYONG KO
Not specified
AMENDMENT OF SOLICITATION_W90VN725RA021-0001THE PURPOSE OF THIS AMENDMENT IS TO REVISED SOW TO CHANGE THE WORDING BELOW.-FROM: ONLY CONCRETE CULVERT OR STEEL PIPE TYPES ARE ACCEPTABLE -TO: ONLY CONCRETE CULVERT IS ACCEPTABLE ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.**********************************************************************************************************************************************************************************CY25 LCS MATOC Work Plan, Repair Railroad, Various Area, Kunsan AB. The contractor shall provide all supervision, labor, tools, parts, materials and transportation necessary to provide service as stated in the Statement of Work and Drawings herein.
The Department of the Army, through the 630th Support Detachment, is soliciting services for the repair of railroads in various areas at Kunsan Air Base under solicitation number W90VN725RA021. This project is categorized under NAICS code 324121 (Asphalt Paving Mixture and Block Manufacturing) and PSC Z1AZ (Maintenance of Other Administrative Facilities and Service Buildings). The contractor is responsible for providing all supervision, labor, tools, parts, materials, and transportation required to perform the work according to the established statement of work and drawings.
Recent amendments to the solicitation have revised the technical requirements to specify that only concrete culverts are acceptable for use, replacing previous language that permitted steel pipe types. All other terms and conditions for the project remain unchanged. Interested parties must submit their responses by the deadline of March 25, 2025. Kyong Ko serves as the primary point of contact for this combined synopsis and solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.