Name | Type | Posted | Actions |
|---|---|---|---|
USSES East Well Log.pdf | Apr 10, 2026 | ||
USSES Main Well Log.pdf | Apr 10, 2026 | ||
Water line drawings from Well House.pdf | Apr 10, 2026 | ||
USSES New Well Log 1937.pdf | Apr 10, 2026 | ||
Well Project Sign In_Dubois_04_02_2026.pdf | Apr 10, 2026 | ||
Sol_1232SA26Q0355_Amd_0001.pdf | Apr 10, 2026 | ||
Responses to RFIs for Dubois Water Well.docx | DOCX | Apr 10, 2026 | |
Updated Specifications.pdf | Apr 10, 2026 | ||
Sol_1232SA26Q0355_v2.pdf | Apr 10, 2026 | ||
Attachment 1 - Drawings.pdf | Mar 24, 2026 | ||
Attachment 2 - Specifications.pdf | Mar 24, 2026 | ||
Attachment 3 - Wage Determination ID20260046.pdf | Mar 24, 2026 | ||
Sol_1232SA26Q0355.pdf | Mar 24, 2026 |
Dubois Well Repair
Dubois Well Repair
Contact and place of performance
David Reynolds
Dubois, ID 83423
USA
See Amendment 0001 and attachments for updated information.
The Agricultural Research Service is issuing solicitation 1232SA26Q0355 for well repair services in Dubois, Idaho. This combined synopsis and solicitation is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC F015 NATURAL RESOURCES/CONSERVATION- WELL DRILLING/EXPLORATORY. David Reynolds is the primary point of contact for this requirement, which was most recently updated on April 10, 2026.
The project scope involves repairs and technical services for multiple wells, with specific details provided in Amendment 0001 and the accompanying 13 attachments. These documents include well logs for the East Well, Main Well, and a 1937 well, along with water line drawings from the well house and a project sign-in sheet from April 2, 2026.
Responses to this solicitation are due by April 24, 2026. All work will be performed on-site at the United States Sheep Experiment Station (USSES) facilities in Dubois, Idaho.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.