Name | Type | Posted | Actions |
|---|---|---|---|
DID81838MGMT.pdf | Feb 13, 2020 | ||
DIDMGMT80441C.pdf | Feb 13, 2020 | ||
Package_Requirement.pdf | Feb 13, 2020 | ||
CDRL.pdf | Feb 13, 2020 | ||
DIDPSSS81534A.pdf | Feb 13, 2020 | ||
Transport_Data.pdf | Feb 13, 2020 | ||
Item_Description.pdf | Feb 13, 2020 | ||
DIDPSSS81995.pdf | Feb 13, 2020 | ||
FA811720R0008.pdf | Feb 13, 2020 | ||
DIDSESS80619D.pdf | Feb 13, 2020 | ||
DIDMISC81832.pdf | Feb 13, 2020 | ||
PWS.pdf | Feb 13, 2020 | ||
DIDMGMT80969.pdf | Feb 13, 2020 | ||
DIDPSSS81656B.pdf | Feb 13, 2020 |
Repair of F-16 Engine Start Controller
Repair of F-16 Engine Start Controller
Contact and place of performance
Matthew Simon
Not specified
Seven Year Delivery Repair Contract: The Contractor shall provide the necessary labor, materials, parts, facilities and equipment required to disassemble, analyze, troubleshoot, repair, and test assets, assemblies and/or parts that are maintained or repaired under this contract. These services also include alignment, adjustment, calibration, testing, movement, storage and reporting status related services to the repa...
View moreThe Department of the Air Force, specifically through the AFSC PZABA office, has issued solicitation FA811720R0008 for a seven-year delivery repair contract. This requirement involves the maintenance, repair, and rebuilding of instruments and laboratory equipment, classified under PSC J066 and NAICS code 336413 for Other Aircraft Parts and Auxiliary Equipment Manufacturing. The selected contractor must provide all labor, materials, parts, facilities, and equipment necessary to disassemble, analyze, troubleshoot, repair, and test various assets and assemblies.
The scope of work encompasses alignment, adjustment, calibration, movement, storage, and reporting services to ensure items are returned to users in a serviceable condition. All repaired end items must maintain the same form, fit, function, and testability as the original government-furnished hardware and software, incorporating any approved and funded updates. Performance includes determining the extent of necessary repairs through inspection and bench checks, ensuring all items pass Original Equipment Manufacturer specifications as validated by Special Test Equipment final acceptance tests.
Contractual responsibilities include the replacement of any component parts that fail to meet inspection requirements or exhibit serviceability concerns due to catastrophic failure, fatigue, or normal deterioration. The solicitation was published on February 13, 2020, and includes 14 attachments such as management requirements, packaging specifications, and transportation data. All responses are due by March 13, 2020, directed to the point of contact, Matthew Simon.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.