Name | Type | Posted | Actions |
|---|---|---|---|
Am_6_Exhibit_IDIQ_Rev.pdf | Oct 29, 2014 | ||
Attachment_J.10_Standard_Exhibit_Fabrication_Specs.pdf | Oct 29, 2014 | ||
Attachment_J.9_Standard_Exhibit_Planning_and_Design_Specs.pdf | Oct 29, 2014 | ||
Am_5_Exhibit_IDIQ.pdf | Oct 17, 2014 | ||
Attachment_Exhibit_Size_and_Type_Form.doc | DOC | Oct 17, 2014 | |
Am_4_Exhibit_IDIQ_RFP.pdf | Sep 29, 2014 | ||
Am_3_Exhibit_IDIQ_RFP.pdf | Sep 10, 2014 | ||
Am_2_Exhibit_IDIQ_RFP.pdf | Sep 4, 2014 | ||
Attachment_J.3_SD_215.pdf | Aug 21, 2014 | ||
Attachment_J.4_SD_418.pdf | Aug 21, 2014 | ||
Am_1_Exhibit_IDIQ_RFP.pdf | Aug 21, 2014 | ||
Attachment_J.2_Exhibit_Case_Alarm_Design.pdf | Aug 21, 2014 | ||
F14SOL10050.pdf | Jul 30, 2014 |
Exhibit Design, Fabrication, and Installation Services IDIQ Smithsonian-Wide
Contact and place of performance
Jennifer L. Kroan
ARLINGTON, VA 22202
USA
For purposes of clarification, though the form on which Amendment No. 6 was presented had a box checkedindicating that the due date was being extended by way of Amendment No. 6, this was a holdover on the form from previous amendments. THE DUE DATE FOR RECEIPT OF PROPOSALS IS NOT EXTENDED. Proposals are due at the Smithsonian Institution Office of Contracting, at the address provided in the RFP,by no later than 3PMon...
View moreThe Smithsonian Institution requires museum exhibit design, fabrication, and installation services through an Indefinite Delivery Indefinite Quantity (IDIQ) contract. This Smithsonian-wide requirement falls under NAICS 712110 for Museums and PSC 99. The solicitation, identified as F14SOL10050, involves a place of performance in Arlington, Virginia. Jennifer L. Kroan serves as the primary point of contact for this requirement, which includes thirteen total attachments such as standard exhibit fabrication specifications, planning and design specifications, and an exhibit size and type form.
Proposals must be submitted to the Smithsonian Institution Office of Contracting no later than 3:00 PM on November 6, 2014. This deadline remained unchanged following the issuance of Amendment No. 6. Offerors are required to acknowledge receipt of all six amendments issued for the request for proposals. This acknowledgment can be completed by signing and returning copies of each amendment or by stating the acknowledgment on the technical proposal cover sheet or within another appropriate section of the proposal.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.