Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation - FA813722R0057.pdf | Jun 23, 2022 | ||
Statement of Work 26 May 2021.pdf | Jun 23, 2022 | ||
Section A_ Executive Summary.pdf | Jun 23, 2022 | ||
MACB (BOA)NOTICE OF INTENT- ANNUAL SYNOPSIS.pdf | Jun 23, 2022 | ||
Experience Matrix.pdf | Jun 23, 2022 | ||
2020 TAFB Mechanical Standard.pdf | Jun 23, 2022 | ||
2020 TAFB Facility Standard.pdf | Jun 23, 2022 | ||
2020 TAFB Electrical Standards.pdf | Jun 23, 2022 | ||
01 45 00.00 10 QUALITY CONTROL.pdf | Jun 23, 2022 | ||
00 72 00 GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf | Jun 23, 2022 | ||
00 71 00 GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf | Jun 23, 2022 | ||
00 70 00 GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf | Jun 23, 2022 |
Tinker AFB Mutiple Award Construction Basic Ordering Agreement (MACB)
Contact and place of performance
Joseph L. Sachleben
0, OK 73145
USA
Question asked: In solicitation L.5.2.3 number of pages ambiguous. Answer: 6 (6) pages not counting resumes Here is the active solicitation for the Tinker AFB Multiple Award Construction Basic Ordering Agreement (MACB) If you are a current MACB BOA Holder, please email [email protected] and [email protected] your intention of staying on or exiting the MACB asap NLT 25 Jul 2022. If you would like to join the current 38 MACB BOA Holders, please propose to this solicitation NLT 25 Jul 2022.
The Department of the Air Force, specifically the AFSC PZIOA office at Tinker Air Force Base, issued solicitation FA813722R0057 to manage the Tinker AFB Multiple Award Construction Basic Ordering Agreement (MACB). This procurement is designated as an SBP (SBP) set-aside and covers work classified under NAICS 236210, Industrial Building Construction, and PSC Z2AA, Repair or Alteration of Office Buildings. The solicitation serves as a vehicle to maintain or expand a pool of 38 existing agreement holders for construction and repair projects at the Oklahoma facility.
The scope of this solicitation includes instructions for both current agreement holders and prospective new participants. Current MACB holders must confirm their intent to remain on the agreement, while new vendors may submit proposals to join the existing pool of contractors. Documentation for this opportunity includes 12 attachments, such as the Statement of Work dated May 26, 2021, a solicitation executive summary, an experience matrix, and mechanical standards for Tinker AFB.
Proposals and expressions of intent must be submitted by the response deadline of July 25, 2022. Administrative guidelines clarify that certain proposal sections are limited to six pages, excluding resumes. Joseph L. Sachleben serves as the primary point of contact for this requirement. Performance is centered at Tinker Air Force Base in Oklahoma.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.