Name | Type | Posted | Actions |
|---|---|---|---|
W912HN-26-R-A006_SPECS_ADMIN_BLDG_VOL3_AMD4 - Copy.pdf | May 5, 2026 | ||
W912HN-26-R-A006_SPECS_EAST_WEST_DOCK_VOL2_AMD4 - Copy.pdf | May 5, 2026 | ||
I.01-Pre-Bid Sign In-2026.04.15 B110 .pdf | Apr 15, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Mar 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HN26RA006¬iceType=SolicitationNotice | LINK | Mar 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 30, 2026 |
Renovate Building 110
Renovate Building 110
Contact and place of performance
Tatjana Fisher
31098
AMD0007- to take off subcontractor costs, the proposal shall contain a minimum of three competitive subcontractor quotes, the quote that was chosen and why it represents the best value to the Government. Proposal shall also contain a complete breakout of material, labor, and other direct or indirect costs required to complete the specific item, extend the proposal due date from 12 June 2026 to 10 July 2026, and invit...
View moreThe U.S. Army Corps of Engineers Savannah District is soliciting proposals for Project Number UHHZ050507, which involves the renovation of Building 110 at Robins Air Force Base in Georgia. This requirement is categorized under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z2EB for Repair or Alteration of Maintenance Buildings. The scope of work includes provide labor, materials, and specialized construction services as detailed across multiple solicitation amendments, which have provided revised technical specifications, contract drawings, and updated hazardous materials reports.
Proposals must be submitted by July 10, 2026. Each proposal is required to contain a complete breakout of material, labor, and other direct or indirect costs. To address subcontractor costs, offerors must include a minimum of three competitive subcontractor quotes and provide a rationale for the selected quote based on best-value principles. Administrative documentation for the solicitation includes four attachments, such as specifications for the administration building and the east/west docks, as well as a pre-bid sign-in sheet from April 2026.
An organized site visit is scheduled for June 10, 2026, to provide access to the project location, with specific coordination required for individuals needing flightline access. The primary point of contact for this solicitation is Tatjana Fisher. The procurement process has utilized several amendments to extend the due date and incorporate structural drawings, wire receptacle cutsheets, and updated technical sections.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.