Name | Type | Posted | Actions |
|---|---|---|---|
APCS SIR Sect L Amend 6.docx | DOCX | Feb 6, 2023 | |
APCS SIR Sect J Att J.1.4 Amend 6.docx | DOCX | Feb 6, 2023 | |
APCS SIR Sect L Att L.7 Amend 6.docx | DOCX | Feb 6, 2023 | |
APC-CMP001 Configuration Management Plan (CMP) Amend 6.docx | DOCX | Feb 6, 2023 | |
APC SIR 693KA8-22-R-00004-Amendment_0006_20230206.pdf | Feb 6, 2023 | ||
APC-SW007 Software Configuration Management Plan (SCMP) Amend 6.docx | DOCX | Feb 6, 2023 | |
APCS SIR Sect L Att L.4 Amend 5.xlsx | XLSX | Jan 25, 2023 | |
APC SIR 693KA8-22-R-00004_Amendment_0005_20230125.pdf | Jan 25, 2023 | ||
APCS SIR Sect L Amend 5.docx | DOCX | Jan 25, 2023 | |
APCS SIR Sect M Amend 5.docx | DOCX | Jan 25, 2023 | |
APC-TES002 Test Procedures (CTP) Amend 5.docx | DOCX | Jan 25, 2023 | |
APC-TES004 Contractor Test Reports (CTR) Amend 5.docx | DOCX | Jan 25, 2023 | |
APC SIR 693KA8-22-R-00004_Amendment 0004_20221130.pdf | Dec 1, 2022 | ||
APCS SIR Sect M Amend 4.docx | DOCX | Dec 1, 2022 | |
APCS SIR Sect L Att L.8 Amend 3.xlsx | XLSX | Nov 22, 2022 | |
APCS SIR Sect L Att L.14 Amend 3.xlsx | XLSX | Nov 22, 2022 | |
APCS SIR Sect J Att J.8.2 Amend 3.xlsx | XLSX | Nov 22, 2022 | |
693KA8-22-R-00004_Amendment 0003_20221122.pdf | Nov 22, 2022 | ||
APCS SIR Sect B Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect B Att A Amend 3.xlsx | XLSX | Nov 22, 2022 | |
APCS SIR Sect C Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect E Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect F Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect J Att J.1.1 Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect J Att J.1.4 Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect L Amend 3.docx | DOCX | Nov 22, 2022 | |
APCS SIR Sect M Amend 3.docx | DOCX | Nov 22, 2022 | |
693KA8-22-R-00004_Amendment 0002 20221021.pdf | Oct 21, 2022 | ||
APCS SIR Sect J Att J.3.1 Amend 2.docx | DOCX | Oct 21, 2022 | |
APCS SIR Sect B Att A Amend 1.xlsx | XLSX | Sep 28, 2022 | |
APCS SIR Sect C Amend 1.docx | DOCX | Sep 28, 2022 | |
APCS SIR Sect J Att J.1.1 Amend 1.docx | DOCX | Sep 28, 2022 | |
APCS SIR Sect J Att J.1.4 Amend 1.docx | DOCX | Sep 28, 2022 | |
APCS SIR Sect L Amend 1.docx | DOCX | Sep 28, 2022 | |
APCS SIR Sect L Att L.8 Amend 1.xlsx | XLSX | Sep 28, 2022 | |
APCS SIR Sect I Amend 1.docx | DOCX | Sep 28, 2022 | |
APCS SIR Sect L Att L.6 Amend 1.docx | DOCX | Sep 28, 2022 | |
693KA8-22-R-00004_Amendment 0001 20220927.pdf | Sep 28, 2022 | ||
APCS SIR Sect E.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect F.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect M.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect I.docx | DOCX | Sep 6, 2022 | |
SF33_693KA8-22-R-00004.pdf | Sep 6, 2022 | ||
APCS SIR Sect B.zip | ZIP | Sep 6, 2022 | |
APCS SIR Sect D.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect G.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect H.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect J.zip | ZIP | Sep 6, 2022 | |
APCS SIR Sect K.docx | DOCX | Sep 6, 2022 | |
APCS SIR Sect L.zip | ZIP | Sep 6, 2022 | |
APCS SIR Sect C.docx | DOCX | Sep 6, 2022 | |
FAA NAS VoICE Public Notices.docx | DOCX | Aug 31, 2022 |
National Airspace System (NAS) A/G Protocol Converter (APC) System
National Airspace System (NAS) A/G Protocol Converter (APC) System
Contact and place of performance
Alessha Mason
USA
01/09/2024 - Significant Milestones: Estimated award updated to February 2024. 02/06/2023 Amendment 0006 to the FAA APC System SIR 693KA8-22-R-00004 is issued. See attached file "693KA8-22-R-00004_Amendment_ 0006_20230206" and associated updated files.NOTE: All documents with the exception of those listed in thefile "693KA8-22-R-00004_Amendment_0006_20230206" and uploaded with this amendement remain unchanged. 01/25/...
View moreThe Federal Aviation Administration (FAA) is soliciting proposals for the National Airspace System (NAS) Air-to-Ground (A/G) Protocol Converter (APC) System under solicitation number 693KA8-22-R-00004. This requirement is categorized under NAICS 334210, Telephone Apparatus Manufacturing, and PSC 7C21, IT and Telecom - Other Data Center Facilities Products (Hardware and Perpetual License Software). The procurement is conducted as a competitive, unrestricted solicitation following the FAA Acquisition Management System (AMS) rather than the Federal Acquisition Regulation (FAR). The primary mission of the APC System is to support the Voice over IP Communication Enterprise (VoICE) program by replacing aging legacy voice switches and addressing Radio Control Equipment obsolescence.
The scope of work encompasses all services and supplies necessary for the design, development, testing, and deployment of the APC System. Key responsibilities include program management, systems engineering, test and evaluation, delivery, installation, integrated logistics support, training, and operational support. The system will be deployed to modernize voice switching core infrastructure at various facilities, including Air Traffic Control Towers (ATCTs), Terminal Radar Approach Control Facilities (TRACONs), Center Radar Approach Control Facility (CERAPs), and Air Route Traffic Control Centers (ARTCCs).
The performance of this contract is located within the United States. Following the submission of Stage 1 proposals in October 2022, the deadline for Stage 2 proposals was established as February 13, 2023. As of the latest update on January 9, 2024, the estimated award date for the contract is February 2024. The solicitation includes 52 attachments, such as the Configuration Management Plan and Software Configuration Management Plan, updated through Amendment 0006. Alessha Mason is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.