Name | Type | Posted | Actions |
|---|---|---|---|
A19 - DBA_WD_Virginia_VA20260026_Mod._No._1_Rev._Date_05.18.26.pdf | Jun 1, 2026 | ||
D2 - Solicitation Amendment W912PM26RA0040002 Conformed Copy.pdf | Jun 1, 2026 | ||
D2 - Solicitation Amendment W912PM26RA0040002 Amendment 2.pdf | Jun 1, 2026 | ||
A19 - DBA_WD_Virginia_VA20260025_Mod._No._1_Rev._Date_05.18.26.pdf | Jun 1, 2026 | ||
Site Visit Presentation.pdf | May 11, 2026 | ||
Site Visit Sign-in Sheet.pdf | May 11, 2026 | ||
A21 - W912PM-26-R-A004 Amendment 01.pdf | May 11, 2026 | ||
CESAW-Philpott Dam Specifications RTA-W912PM26RA004_25Mar2026.pdf | Apr 14, 2026 | ||
A21 - CESAW-Philpott Dam Specifications RTA-W912PM26RA004_25Mar2026.pdf | Apr 13, 2026 | ||
A21 - Locked Drawings.pdf | Apr 13, 2026 | ||
A19 - DBA_WD_Virginia_VA20260026_Mod._No._0_Rev._Date_01.02.26.pdf | Apr 13, 2026 | ||
A19 - DBA_WD_Virginia_VA20260025_Mod._No._0_Rev._Date_01.02.26.pdf | Apr 13, 2026 | ||
B9 - Attachment 1 Proposal Data Sheet.pdf | Apr 13, 2026 | ||
B9 - Enclosure 3 General Proposal Submittsion and Tabbing Requirements.pdf | Apr 13, 2026 | ||
A21 - Solicitation - W912PM26RA004 Phl Anchors Final.pdf | Apr 13, 2026 | ||
A21 - Unlocked Drawings.pdf | Apr 13, 2026 |
Philpott Anchors and Instrumentation Construction
The US Army Corps of Engineers Wilmington office is seeking proposals for structural stabilization and monitoring at Philpott Dam in Bassett, Virginia. This project addresses concrete cracking caused by Alkali-Aggregate Reaction (AAR) through the installation of 12 re-stressable spillway anchors and a suite of geotechnical instruments, including load sensors, inclinometers, and piezometers. The estimated project value is between $5,000,000 and $10,000,000. Amendment 0002 has extended the period of performance for all 19 CLINs to 640 calendar days. Electronic proposals are due by June 19, 2026, at 1:00 PM EDT. The government will not accept hand-carried, CD-ROM, or facsimile submissions. The solicitation package includes conformed documents, engineering drawings, and updated Davis-Bacon wage determinations for the project area. The USACE Wilmington District is soliciting for structural stabilization and monitoring at Philpott Dam in Virginia. The work focuses on mitigating concrete cracking through the installation of 12 re-stressable anchors and various geotechnical sensors. The project is valued between $5M and $10M. The project involves structural remediation and monitoring at Philpott Dam to address concrete cracking caused by Alkali-Aggregate Reaction (AAR).
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Jenifer Garland
Bassett, VA
USA
PROJECT TITLE: W912PM26RA004 - PHILPOTT DAM ANCHORS AND INSTRUMENTATION CONSTRUCTION PROJECT LOCATION: PHILPOTT, VIRGINIA SOLICITATION W912PM26RA004 - PHILPOTT DAM ANCHORS AND INSTRUMENTATION CONSTRUCTION THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $5,000,000.00 AND $10,000,000.00. -------------------------------UNRESTRICTED-------------------------------------------------------- HAND CARRIED PROPOSALS...
View more